Additional facilities for liquefied petroleum gas project within existing onshore treatment plant, Burrup Peninsula

Project
Proponent: 
Woodside Offshore Petroleum Pty Ltd
Proposal description: 

The proposal is to establish additional facilities for liquefied petroleum gas (LPG) extraction and export within the existing onshore treatment plant at the Burrup Peninsula.

The existing Gas Treatment Plant occupies 231ha on a lease at Withnell Bay, near Dampier on the Burrup Peninsula about 1,300km north of Perth. The area within the lease has undergone major development, with the portions of Plant constructed to date consisting of a domestic gas plant, a liquefied natural gas (LNG) plant, LNG storage facilities, condensate storage facilities, a ship jetty, ship loading equipment, and administration buildings. The proposal involves the installation of two LPG storage tanks, a chiller unit, fire protection equipment, an auxiliary substation and associated infrastructure within the existing process area and a new ship jetty parallel with, and to the north of, the existing jetty. No extension of the Plant boundary would be required.

Assessment Number: 
782
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Oil and gas
Last updated: 
August 24, 1993
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Consultative Environmental Review
Preliminary Environmental Factors: 
Social Surroundings
Benthic Communities and Habitats
Marine Environmental Quality
Date published: 
Saturday, 6 February, 1993
3. Assessment
Scoping
Approved: 
Friday, 26 February, 1993
Environmental Review
Public submissions: 
Monday, 26 April, 1993 to Tuesday, 25 May, 1993
Environmental Review documentation: 
PDF icon Consultative Environmental Review document
PDF icon CER appendix - risk assessment
4. EPA Report on assessment
EPA Report Number: 
694
EPA Report: 
PDF icon Additionai iaciiities for liquefied petroleum gas project within existing onshore treatment plant, Burrup Peninsula
Date published: 
Friday, 30 July, 1993
Appeals close: 
Friday, 13 August, 1993
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Tuesday, 24 August, 1993
Ministerial Statement: 
PDF icon Ministerial Statement 320