EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > St Ives Gold Mine – Beyond 2018 Project (Revised Proposal)

St Ives Gold Mine – Beyond 2018 Project (Revised Proposal)

Project
Proponent: 
St Ives Gold Mining Company Pty Limited
Proposal description: 

St Ives Gold Mining Company Pty Limited proposes to expand the existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located in Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie).

The revised proposal would include an additional disturbance of 5000 ha:

  • additional lake-based disturbance of up to 2,000 ha; and
  • additional land-based disturbance of up to 3,000 ha.
Proposal Content Document: 
PDF icon Proposal Content Document.pdf
Assessment Number: 
2113
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Gold
Last updated: 
April 19, 2024
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
St Ives Gold Mine - Beyond 2018 Project (Revised Proposal)
Comment period: 
Thursday, 5 January, 2017 to Wednesday, 11 January, 2017
Referral documentation: 
PDF icon Referral Form
PDF icon Supporting Documentation
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon St Ives Gold Mine – Beyond 2018 Project (Revised Proposal)
Preliminary Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 20 February, 2017
3. Assessment
Scoping
Environmental scoping document for public comment: 
PDF icon Environmental Scoping Document
Environmental Review
Public submissions: 
Wednesday, 3 October, 2018 to Wednesday, 14 November, 2018
Make a submission: 
St Ives Gold Mine - Public Environmental Review
Environmental Review documentation: 
PDF icon ST IVES GOLD MINE - Environmental Review Document.pdf
PDF icon Appendix A (Tenement summary).pdf
PDF icon Appendix B (Endorsed ESD - St Ives Gold Mine Beyond 2018 Project).pdf
PDF icon Appendix C (Stakeholder engagement summary).pdf
PDF icon Appendix D (Flora and veg survey).pdf
PDF icon Appendix E (Flora and veg survey - regional).pdf
PDF icon Appendix F (Flora and veg survey supplementary).pdf
PDF icon Appendix G (Tecticornia survey report).pdf
PDF icon Appendix H (RMCP).pdf
PDF icon Appendix I (Terrestrial Fauna Survey).pdf
PDF icon Appendix J (Night Parrot targeted survey).pdf
PDF icon Appendix K (Sub fauna survey).pdf
PDF icon Appendix L (Surface water modelling).pdf
PDF icon Appendix M (hydrogeological report).pdf
PDF icon Appendix N (Water balance framework).pdf
PDF icon Appendix O (Ecological Assessment of Lake Lefroy and Wetlands).pdf
PDF icon Appendix P (AMD optimisation study).pdf
PDF icon Appendix Q (summary of AMD assessments).pdf
PDF icon Appendix R (Noise and vibration).pdf
PDF icon Appendix S (Visual impact assessment).pdf
PDF icon Appendix T (Greenhouse gas projection).pdf
Date Published (Environmental Review documentation): 
October 3, 2018
Proponent response to submissions: 
PDF icon Beyond 2018 Project Response to Submissions (Final).pdf
Date published (Proponent response to submissions): 
May 16, 2019
4. EPA Report on assessment
EPA Report Number: 
1645
EPA Report: 
PDF icon EPA Report 1645 - St Ives Gold Mine: The Beyond 2018 Project
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Inland Waters
Date published: 
Wednesday, 24 July, 2019
Appeals close: 
Wednesday, 7 August, 2019
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 18 March, 2020
Ministerial Statement: 
PDF icon Statement 1128.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 1128 - Increase in the size of the development envelope by 572 hectares. Inclusion of a hybrid energy-source powered microgrid (hybrid microgrid) within the land-based operations. Change to conditions approved 18 December 2023.  

Attachment 2 to Statement 1128 - Increase to extent of development envelope by 4 ha. Realignment of a transmission line associated with the hybrid energy-source powered microgrid.. Change to conditions approved 19 April 2024.  

Attachments: 
PDF icon s. 45c Attachment 1 Summary_of_reasons.pdf
PDF icon s. 45C Attachment 2 - Notice and Summary of Reasons.pdf
Date of approval s. 45C: 
Monday, 18 December, 2023
Friday, 19 April, 2024

Source URL:https://www.epa.wa.gov.au/proposals/st-ives-gold-mine-%E2%80%93-beyond-2018-project-revised-proposal