Fimiston Gold Mine Operations Extension Stage 3 and Mine Closure Planning

Project
Proponent: 
Kalgoorlie Consolidated Gold Mines Pty Ltd
Proposal description: 

This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the proposal by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) to expand their Fimiston operations in Kalgoorlie by widening and deepening the Superpit by means of the Golden Pike Cutback, and to plan for mine closure.

Assessment Number: 
1581
Region: 
Goldfields Esperance
Referred under EP Act: 
s38
Industry sector: 
Gold
Last updated: 
June 17, 2015
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Formal under Section 43 (Not appealable)
Date published: 
Monday, 25 July, 2005
3. Assessment
Scoping
Environmental scoping document for public comment: 
PDF icon App A1 - KCGM Stage 3 Env Scoping Document Jan 2006.pdf
Environmental Review
Environmental Review documentation: 
PDF icon KCGM Fimiston Open Pit Extension PER
PDF icon App A1 - KCGM Stage 3 Env Scoping Document Jan 2006.pdf
PDF icon App B1 - KCGM Conceptual Mine Closure Strategy July 2006.pdf
PDF icon App C1 - KCGM Rehabilitation Vegetation Survey Jan 2006.pdf
PDF icon App D1 - KCGM Seepage and Groundwater Management Plan Sep 2005.pdf
PDF icon App D2 - Fimiston I TSF NOI Addendum Increase in Height April 2003.pdf
PDF icon App D3 - Fimiston II TSF NOI Increase in Height Volume I Sept 2005.pdf
PDF icon App D3 - Fimiston II TSF NOI Increase in Height Volume II Sept 2005 (1).pdf
PDF icon App D4 - Kaltails TSF Hydrogeological Review June 2006.pdf
PDF icon App D5 - Fimiston Groundwater and Seepage Recovery Review 1993-2005 July 2006.pdf
PDF icon App D6 - Implication of increases in height of TSFs.pdf
PDF icon App E1 - Golden Pike Noise Report June 2005.pdf
PDF icon App E1 - Northern Waste Rock Dump Noise Report July 2006.pdf
PDF icon App E2 - Effects of Blasting in the Golden Pike Cutback Feb 2006.pdf
PDF icon App E3 - Noise and Vibration Monitoring and Management Programme.pdf
PDF icon App F1 - Tellurides and Mercury in Fimiston Open Pit May 2006.pdf
PDF icon App F2 - Gidji and Fimiston Stack Testing and Modelling July 2005.pdf
PDF icon App F3 - Acid Rock Drainage Risk Evaluation Fimiston Aug 2006.pdf
PDF icon App G1 - Dust Modelling Study Aug 2006.pdf
PDF icon App H1 - Geotechnical Assessment Golden Pike Cutback Feb 2004.pdf
PDF icon App H1 - Pit Abandonment and Design for Golden Pike Cutback July 2005.pdf
PDF icon App H2 - Golden Pike Flyrock Modelling Report Nov 2005.pdf
PDF icon App H3 - Draft Golden Pike Blast Management Plan July 2006 x.pdf
PDF icon KCGM Fimiston Open Pit Extension PER Main Report Sept 06.pdf
Proponent response to submissions: 
PDF icon KCGM Response to Public Submissions
4. EPA Report on assessment
EPA Report Number: 
1270
EPA Report: 
PDF icon EPA Report 1270
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

The continuation of mining operations at the Fimiston site, and expansion and deepening of the Superpit to 600 metres via the Golden Pike Cutback. Additional waste dumps will be created to the north of the pit to contain 140 million tonnes of waste rock. The Fimiston I and II tailings storage facilities and/or the Kaltails tailings storage facility will be expanded to contain the additional tailings.

Date of approval: 
Wednesday, 28 January, 2009
Ministerial Statement: 
PDF icon Ministerial Statement 0782
Post-assessment changes
S46C changes to conditions: 

Attachment 2 to Statement 782 – Replacement of condition 11-3 – change to proposal approved under section 46C on 23 July 2013.

Date S46C: 
Tuesday, 23 July, 2013
s. 45C amendments: 

Attachment 1 to Statement 782 – Clearing for Kaltails tailings storage facility, contingency clearing for infrastructure post Kaltails recommissioning, and inclusion of hydrogen peroxide dosing facility – change to proposal approved under s45C on 6 September 2010.

Attachment 3 to Statement 782 – Removal of different options for management of tailings in the description of the proposal; updated description of the proposal including the ‘Proposal footprint’ and ‘Mine Development Envelope’; and removal of elements that are not key proposal characteristics relevant to the environment or managed under other legislation – change to proposal approved under section 45C on 17 June 2015.

Date of approval s. 45C: 
Monday, 6 September, 2010
Wednesday, 17 June, 2015

Source URL:https://www.epa.wa.gov.au/proposals/fimiston-gold-mine-operations-extension-stage-3-and-mine-closure-planning-0