EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Sulphur Springs Zinc-Copper Project

Sulphur Springs Zinc-Copper Project

Project
Proponent: 
Venturex Resources Limited
Proposal description: 

Venturex Resources Limited propose to develop the Sulphur Springs Zinc-Copper Project located approximately 144 kilometres (km) south-east of Port Hedland and 57 km west of Marble Bar.  The project includes an open pit mine to extract the upper portion of the orebody and an underground mine to extract the lower portion of the orebody.

The project has a disturbance footprint of 313.6 hectares (ha) within an 889.2 ha development envelope and consists of the following physical and operational elements:

  • an open pit to mine the upper portion of the orebody
  • an underground mine (accessed via a portal) to mine the remainder of the orebody
  • mine dewatering and groundwater abstraction for water supply
  • a conventional processing plant which will produce separate copper and zinc concentrations
  • a conventional ‘valley fill’ tailings storage facility
  • a waste rock dump
  • supporting infrastructure.
  • The proposal has undergone two changes pursuant to section 43A of the Environmental Protection Act since the project was referred in December 2016.  The proposal description above reflects these changes.
Assessment Number: 
2120
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Copper
Last updated: 
May 20, 2020
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Sulphur Springs Zinc-Copper Project
Comment period: 
Thursday, 5 January, 2017 to Wednesday, 11 January, 2017
Referral documentation: 
PDF icon Referral form
PDF icon Supporting documentation Part 1
PDF icon Supporting documentation Part 2
PDF icon Supporting documentation Part 3
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Environmental review - No public review
Extract of determination: 
PDF icon Sulphur Springs Zinc-Copper Project
Preliminary Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Inland Waters Environmental Quality
Date published: 
Monday, 17 July, 2017
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document - Sulphur Springs Zinc-Copper Project
Approved: 
Monday, 2 October, 2017
Environmental Review
Environmental Review documentation: 
PDF icon Sulphur Springs Environmental Review Document
PDF icon Appendix 1 - Environmental Scoping Document
PDF icon Appendix 2 - Sulphur Springs Project Waste Rock Geochemistry Overview
PDF icon Appendix 3 - Tailings Geochemistry - Summary Memorandum
PDF icon Appendix 4 - Tailings Storage Facility Preliminary Conceptual Design
PDF icon Appendix 5 - Tailings Physical Testing
PDF icon Appendix 6 - Sulphur Springs - Preliminary Seismic Hazard Assessment
PDF icon Appendix 7 - Sulphur Springs Tailings Storage Facility - High Level Geotechnical Location Review
PDF icon Appendix 8 - Sulphur Springs Zinc-Copper Project Conceptual Mine Closure Plan
PDF icon Appendix 9 - Sulphur Springs Project Water Balance
PDF icon Appendix 10 - Stakeholder Consultation Register
PDF icon Appendix 11 - Sulphur Springs Environmental Impact Consequence Definitions
PDF icon Appendix 12 - Environmental Risk Assessment Matrix
PDF icon Appendix 13 - Sulphur Springs Flora and Vegetation Assessment
PDF icon Appendix 14 - Flora & Vegetation Survey of the Mine and Access Road for the Panorama Project
PDF icon Appendix 15 - Flora and Vegetation Survey Quadrat Detail
PDF icon Appendix 16 - Sulphur Springs Project Groundwater Assessment
PDF icon Appendix 17 - Sulphur Springs Project Water Management Plan
PDF icon Appendix 18 - Flora and Vegetation Management Plan
PDF icon Appendix 19 - Sulphur Springs Subterranean Fauna Assessment
PDF icon Appendix 20 - Panorama Project Subterranean Fauna Report
PDF icon Appendix 21 - Sulphur Springs Project Surface Water Assessment
PDF icon Appendix 22 - Sulphur Springs Soil Assessment
PDF icon Appendix 23 – Landform Evolution Modelling
PDF icon Appendix 24 - Sulphur Springs Targeted Fauna Assessment
PDF icon Appendix 25 - Level 1 Terrestrial Fauna Survey
PDF icon Appendix 26 - Targeted Terrestrial SRE Invertebrate Assessment
Date Published (Environmental Review documentation): 
February 17, 2020
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon CMS16058 - s43A Notice of Decision - 050718
PDF icon CMS16058 - s43A Notice of Decision - 281119.pdf
PDF icon CMS16058 - s43A Notice of Decision-240320
Date of approval s. 43A: 
Tue, 24/03/2020
4. EPA Report on assessment
EPA Report Number: 
1671
EPA Report: 
PDF icon EPA Report 1671 - Sulphur Springs Zinc-Copper Project.pdf
Key Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Environmental Quality
Inland Waters
Date published: 
Monday, 30 March, 2020
Appeals close: 
Tuesday, 14 April, 2020
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 20 May, 2020
Ministerial Statement: 
PDF icon Ministerial Statement 1134

Source URL:https://www.epa.wa.gov.au/proposals/sulphur-springs-zinc-copper-project