Perth Groundwater Replenishment Scheme Stage 2

Project
Proponent: 
Water Corporation
Proposal description: 

The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers.

The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14 GL per annum to Stage 1 of the GWRS, resulting in a total recharge to the Leederville and Yarragadee aquifers of approximately 28 GL per annum.

Assessment Number: 
2111
Region: 
Perth
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
December 4, 2018
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Groundwater Replenishment Scheme Stage 2
Comment period: 
Wednesday, 9 November, 2016 to Tuesday, 15 November, 2016
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Referral Information
Extract of determination: 
PDF icon Chairman's Determination - Perth Groundwater Replenishment Scheme Stage 2
Preliminary Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 30 January, 2017
3. Assessment
Minor or preliminary work under s. 41A(3)
s. 41A(3) notice: 
PDF icon s41A(3) Notice of approval
PDF icon s41A(3) Statement of Reasons
Date of approval s. 41A(3): 
Wednesday, 24 May, 2017
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon s43A Notice and schedule
PDF icon s43A Statement of Reasons
PDF icon Application to change proposal under S43A
Date of approval s. 43A: 
Mon, 08/05/2017
4. EPA Report on assessment
EPA Report Number: 
1597
EPA Report: 
PDF icon Perth Groundwater Replenishment Scheme – Stage 2
Proponent documents: 
PDF icon Construction Environmental Management Framework
PDF icon CEMF - Appendix A - Environmental Constraint Figures (Part 1)
PDF icon CEMF - Appendix A - Environmental Constraint Figures (Part 2)
PDF icon CEMF - Appendix B - Environmental Policy
PDF icon CEMF - Appendix C - Acid Sulfate Soil and Dewatering Management Plan
PDF icon CEMF - Appendix E - Example Sediment and Stormwater Control Designs
PDF icon Geotechnical Investigation (Part 1)
PDF icon Geotechnical Investigation (Part 2)
PDF icon Geotechnical Investigation (Part 3)
PDF icon Referral Supporting Document (Part 1)
PDF icon Referral Supporting Document (Part 2)
PDF icon Referral Supporting Document (Part 3)
PDF icon Appendix A - Ecologia Biological Survey
PDF icon Appendix B - 360 Flora and Fauna Survey (Part1)
PDF icon Appendix B - 360 Flora and Fauna Survey (Part 2)
PDF icon Appendix B - 360 Flora and Fauna Survey (Part 3)
PDF icon Appendix C - 360 Black Cockatoo Assessment
PDF icon Appendix D - Subterranean Fauna
PDF icon Appendix E - Heritage Survey
PDF icon Appendix F - Arboriculturist Report
PDF icon Appendix G - Preliminary Risk Assessment Report
PDF icon Appendix H - Environmental Values Report
PDF icon Appendices I to P
PDF icon Stakeholder Consultation
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 29 May, 2017
Appeals close: 
Monday, 12 June, 2017
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Thursday, 12 October, 2017
Ministerial Statement: 
PDF icon Ministerial Statement 1065.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Ministerial Statement 1065 - Increase in the development envelope to allow for laydown areas and pipe stringing; and a change in the alignment of the recharge pipeline and development envelope to allow for greater lengths of trenchless construction – change to proposal approved under s45C on 7 May 2018.

Attachment 2 to Ministerial Statement 1065:

Changes:

  • modified location and alignment of the pipe being installed using trenchless technology including relocation of the two drill pits at either end of the 'trenchless technology' instalation
  • addition of approximately 50 metres of pipe between the new trenchless technology installation and the approved alignment which will be constructed using open trench construction methods; and
  • removal from the develpment envelope of approximately 385 metres (m) of pipe installation.

Change to proposal approved under s45C on 4 December 2018.

Date of approval s. 45C: 
Monday, 7 May, 2018