Proposal description: 

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie.

The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same alignment as the existing Collie A Power Station wastewater pipeline with a route deviation through the coastal foredune system, and an ocean outfall consisting of an approximately 650 metre long pipe including a 110 metre long diffuser located north of the Leschenault Inlet at Buffalo Road.

Assessment Number: 
1733
Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
January 20, 2011
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon 1733-ChairDets-210408.pdf
Preliminary Environmental Factors: 
Social Surroundings
Marine Environmental Quality
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 21 April, 2008
3. Assessment
Environmental Review
Public submissions: 
Monday, 13 July, 2009 to Monday, 7 September, 2009
Environmental Review documentation: 
PDF icon Bluewaters Power Station - Phase 3 and 4 - PER
PDF icon Air dispersion modelling study and screening health risk assessment
PDF icon Review of the Screening Health Risk Assessment
PDF icon EIA For Ash Co-Disposal
PDF icon Saline Waste Disposal Proposed Pipeline Alignment Acid Sulfate Soil Desktop Review
PDF icon Report on Biomass Co firing and Carbon Capture Ready Plant
PDF icon Construction Environmental Management Plan
PDF icon Operation Environmental Management Plan
PDF icon Inspection of trees on Bluewaters Farm for nesting by Black Cockatoos
PDF icon Inspection of trees in area south of the Power Station and along the proposed pipeline route for black-cockatoo nesting habitat
PDF icon Greenhouse Gas Emission
PDF icon Greenhouse Gas Management Plan
PDF icon Social and economic impact assessment
PDF icon  Flora and fauna survey
PDF icon Environmental Support Studies – Saline Discharge Pipeline and Marine Outfall Study
PDF icon Griffin Outfall: Updated assessment for reduced flows (down to 0.7 ML/d from 10 ML/d)
PDF icon Environmental Noise Impact Assessment
PDF icon Bluewaters Water Supply Strategy
Proponent response to submissions: 
PDF icon Response to submissions
4. EPA Report on assessment
EPA Report Number: 
1349
EPA Report: 
PDF icon Bluewaters Power Station Expansion - Phase III and Phase IV, Collie
Date published: 
Monday, 8 March, 2010
Appeals close: 
Monday, 22 March, 2010
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Ministerial Statement 837 published on 17 Sep 2010 - under appeal on Conditions. Subsequently, Ministerial Statement 851 was published on 20 Jan 2011 to amend 837.

Date of approval: 
Thursday, 20 January, 2011
Ministerial Statement: 
PDF icon Ministerial Statement 837
PDF icon Ministerial Statement 851
Post-assessment changes
Section 46 inquiry: 
Bluewaters Power Station Expansion - Phase III and Phase IV (s46)

Source URL:https://www.epa.wa.gov.au/proposals/bluewaters-power-station-expansion-phase-iii-and-phase-iv