EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Ashburton River Sand and Shingle Excavation within Mining Leases 08/458 and 08/461

Ashburton River Sand and Shingle Excavation within Mining Leases 08/458 and 08/461

Project
Proponent: 
Onslow Resources Ltd
Proposal description: 

Onslow Resources Ltd proposes to mine up to 2.3 million tonnes of river sand and shingle in the Ashburton riverbed within the Minderoo Pastoral Lease. Mining will only take place when the river is dry and production will be limited by the rate that material is able to be replenished by flow events. Mining will be confined to replenishable material.

The operation is small and low impact within M08/458 and M08/461 and will produce two product lines: sand and aggregate.

Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Sand, rock, gravel and clay
Last updated: 
September 2, 2013
Current Status: 
Decision on whether to assess has been published
1. Referral
Comment period: 
Tuesday, 23 July, 2013 to Monday, 29 July, 2013
Referral documentation: 
Referral information (PDF, 3.03 MB)
Referral maps (PDF, 1.53 MB)
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)
Extract of determination: 
13-201882 - CD - 020913.pdf (PDF, 158.44 KB)
Public advice: 
Ashburton River Sand - Public Advice 13-201882 (PDF, 406.91 KB)
Date published: 
Monday, 2 September, 2013

Source URL:https://www.epa.wa.gov.au/proposals/ashburton-river-sand-and-shingle-excavation-within-mining-leases-08458-and-08461