Koodaideri Iron Ore Mine and Infrastructure Project

Project
Proponent: 
Mount Bruce Mining Pty Ltd
Proposal description: 

Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman.

The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre railway connecting into the main network operated by Rio Tinto’s iron ore business. The mine may produce up to 70 million tonnes per annum (Mt/a) of ore and the expected operational mine life is approximately 30 years.

Assessment Number: 
1933
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
March 7, 2024
Related EPA Media Statement: 
Iron ore mine recommended for conditional approval by EPA
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Referral documentation: 
PDF icon A509149- Referral Form and Appendix 1_Supporting Information Document.pdf
PDF icon A509149-Appendix 2 _Baseline Surveys.pdf
PDF icon A509149-Appendix 3_Terrestrial Fauna.pdf
PDF icon A509149-Appendix 4_A Vegetation and Flora Survey.pdf
PDF icon A509149-Appendix 5_Targeted Fauna Survey.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Chairman's Determination - Koodaideri
Preliminary Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 30 July, 2012
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document - Koodaideri Iron Ore Mine and Infrastructure Project
Approved: 
Friday, 4 January, 2013
Bilateral assessment (EPBC Act): 
2012/6422
Environmental Review
Public submissions: 
Monday, 22 July, 2013 to Monday, 2 September, 2013
Make a submission: 
Koodaideri Iron Ore Mine and Infrastructure Project
Environmental Review documentation: 
PDF icon Public Environmental Review - Koodaideri Iron Ore Mine and Infrastructure Project
Proponent response to submissions: 
PDF icon Response to Submissions - Koodaideri Iron Ore Mine and Infrastructure Project
4. EPA Report on assessment
EPA Report Number: 
1533
EPA Report: 
PDF icon EPA Report 1533 - Koodaideri Iron Ore Mine and Infrastructure Project
Key Environmental Factors: 
Human Health
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Tuesday, 18 November, 2014
Appeals close: 
Tuesday, 2 December, 2014
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Tuesday, 10 March, 2015
Ministerial Statement: 
PDF icon Statement 999.pdf
Post-assessment changes
S46C changes to conditions: 

Attachment 2 to Statement 999 - Amendment to condition 14-2, approved under S46C on 4 January 2021.

Date S46C: 
Monday, 4 January, 2021
s. 45C amendments: 

Attachment 1 to Statement 999 - 

Changes:

  • Change the size of the Southern Infrastructure Corridor (SIC) development envelope from 12,003 ha to 5,465 ha. This involves:
  • Reduction of the Southern Infrastructure Corridor development envelope by 6,668 hectares (ha).
  • Addition of 130 ha to the Southern Infrastructure Corridor development envelope for the re-alignment of the power line and maintenance track.
  • Update Figures 1, 2 and 5 and geographic coordinates as defined in Table 2 of Schedule 2.

Change to conditions approved under S45C on 6 September 2017.

Attachment 2 to Statement 999 - Amendment to condition 14-2, approved under S46C on 4 January 2021.

Attachment 3 to Statement 999 - Changes:
•Increase the extent of the Southern Infrastructure Corridor development envelope from 5,465 ha to 6,122 ha to facilitate the construction and operation of a water transfer pipeline for ongoing mining operations.
•Increase in the extent of vegetation clearing within the amended Southern Infrastructure Corridor development envelope from 246 ha to 384 ha.
•Southern Infrastructure Corridor development envelope activities to include the construction and operation of a water transfer pipeline and associated infrastructure.
•Update Figure 1 and geographic coordinates as defined in Table 2 of Schedule 2. Changes approved under s. 45C on 7 March 2024.

Attachments: 
PDF icon MS 999 - s45C - Summary of reasons.pdf
Date of approval s. 45C: 
Wednesday, 6 September, 2017