EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Thunderbird Mineral Sands Project

Thunderbird Mineral Sands Project

Project
Proponent: 
Sheffield Resources
Proposal description: 

Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export.

Assessment Number: 
2073
Region: 
Kimberley
Referred under EP Act: 
s38
Industry sector: 
Mineral sands
Last updated: 
November 8, 2022
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Comment on this referral: 
Thunderbird Mineral Sands Project
Comment period: 
Monday, 30 November, 2015 to Sunday, 6 December, 2015
Referral documentation: 
PDF icon Referral Document - Thunderbird Mineral Sands Project
PDF icon Supporting Documentation - Part 1
PDF icon Supporting Documentation - Part 2
PDF icon Supporting Documentation - Part 3
PDF icon Supporting Documentation - Part 4
PDF icon Supporting Documentation - Part 5
PDF icon Supporting Documentation - Part 6
PDF icon Supporting Documentation - Part 7
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Chairman's Determination - Thunderbird Mineral Sands Project
Preliminary Environmental Factors: 
Social Surroundings
Marine Environmental Quality
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 21 December, 2015
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document - Thunderbird Mineral Sands Project
Approved: 
Monday, 4 July, 2016
Bilateral assessment (EPBC Act): 
2016/7648
Environmental Review
Public submissions: 
Monday, 16 January, 2017 to Monday, 13 February, 2017
Make a submission: 
Public Environmental Review - Thunderbird Mineral Sands Project
Environmental Review documentation: 
PDF icon Thunderbird PER document
PDF icon Appendix 1 Section 43A application
PDF icon Appendix 2 Submission Checklists
PDF icon Appendix 3 Sheffield Resources Environmental Policy
PDF icon Appendix 4 Thunderbird Mine Closure Plan
PDF icon Appendix 5 Mine Site Development Envelope Surface Hydrology Study
PDF icon Appendix 6 Mine Site Development Envelope Soil and Landform Assessment
PDF icon Appendix 7 Landform Assessment Methodology
PDF icon Appendix 8 H3 Hydrogeological Assessment
PDF icon Appendix 9a Ecologia 2012 Level 1 Flora and Fauna Assessment
PDF icon Appendix 9b Ecologia 2012 Thunderbird Cultural Heritage Flora and Fauna Assessment
PDF icon Appendix 9c Ecologia 2013 Thunderbird Flora and Fauna Survey Scoping Study Report
PDF icon Appendix 9d Ecologia 2014 Level 2 Terrestrial & Subterranean Assessment
PDF icon Appendix 9e Ecologia 2014 Thunderbird Targeted SRE Report
PDF icon Appendix 9f Ecologia 2016 Haul Road Flora & Fauna Level 1 Assessment Rev 1
PDF icon Appendix 9g Ecologia 2016 Thunderbird Targeted Greater Bilby Assessment Rev 2
PDF icon Appendix 9h Mattiske 2016a Flora and Vegetation
PDF icon Appendix 9i Mattiske 2016b GDE Study
PDF icon Appendix 9j Western Wildlife 2016 Thunderbird Fauna Peer Review
PDF icon Appendix 10 Fauna Survey Peer Review
PDF icon Appendix 11 Fauna Which Have Potential to Occur at the Mine Site Development Envelope
PDF icon Appendix 12 Mine Site Development Envelope Air Quality Assessment
PDF icon Appendix 13 Mine Site Development Envelope Noise Assessment
PDF icon Appendix 14 Port BCA and ASS Assessment
PDF icon Appendix 15 DPaW Fauna Search 5288
PDF icon Appendix 16 EPBC Search Derby Port and Transhipment Route
PDF icon Appendix 17 Derby Port Development Envelope Air Quality Assessment
PDF icon Appendix 18 Derby Port Development Envelope Noise Assessment
PDF icon Appendix 19 Mine Waste Characterisation Study
PDF icon Appendix 20 Mine Residues Characterisation Study
PDF icon Appendix 21 Radiation Reports
PDF icon Appendix 22 Preliminary Vegetation EMP
PDF icon Appendix 23 Bilby Environmental Management Plan Final
PDF icon Appendix 24 Groundwater Management Plan
PDF icon Appendix 25 Preliminary Port EMP
PDF icon Appendix 26 Aboriginal Heritage Management Operations Framework
PDF icon Appendix 27a DoEE offset-assessment-guide Bilbyv2 LOM
PDF icon Appendix 27b DoEE offset-assessment-guide Bilbyv2 Temp
Proponent response to submissions: 
PDF icon Response to submissions
PDF icon RTS - Attachment 1 - Flora GAP Analysis
PDF icon RTS - Attachment 2 - F1 Humpback whale Kimberley calving grounds and migratory routes
Minor or preliminary work under s. 41A(3)
s. 41A(3) notice: 
PDF icon Notice of decision to consent to minor or preliminary works (s41A(3))
Date of approval s. 41A(3): 
Thursday, 27 July, 2017
Change to proposal during assessment under s. 43A
s. 43A notice: 
PDF icon Section 43A Notice of decision to consent to change to proposal during assessment and Statement of Reasons
Date of approval s. 43A: 
Thu, 14/09/2017
4. EPA Report on assessment
EPA Report Number: 
1606
EPA Report: 
PDF icon EPA Report 1606 - Thunderbird Mineral Sands Project
Key Environmental Factors: 
Social Surroundings
Coastal Processes
Marine Environmental Quality
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Date published: 
Monday, 9 October, 2017
Appeals close: 
Monday, 23 October, 2017
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Friday, 10 August, 2018
Ministerial Statement: 
PDF icon Statement 1080.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Ministerial Statement 1080

Changes:
• Export of bulk products via Broome in addition to Derby
• Increase of the number of journeys per day between the Mine Site and Broome.
• Inclusion of the amount of bulk mineral sand products in Mega tonnes per annum
being exported from the Port of Broome in Table 2.
• Removal of the amount of storage for packaged mineral sand products at Broome
Port from Table 2.
• A 30 ha Increase in clearing for infrastructure and a 30 ha decrease in clearing for
mining.

Changes approved under s.45C on 8 November 2022.

Attachments: 
PDF icon Attachment 1 to Ministerial statement 1080 - s45c amendment to proposal.pdf
PDF icon Attachment 1- Notice and summary of reasons.pdf
Date of approval s. 45C: 
Tuesday, 8 November, 2022

Source URL:https://www.epa.wa.gov.au/proposals/thunderbird-mineral-sands-project