Yarnima Power Station Stage 4 (Gas Reciprocating Engines)

Project
Proposal description

The proponent, BHP Iron Ore Pty, proposes to increase power generation capacity at the existing Yarnima Power Station, approximately 2 kilometres north-west of Newman in the Pilbara. The proposal comprises an increase in installed firm power generation capacity from 154 megawatts up to 239 megawatts via installation of gas reciprocating engines and associated infrastructure. The gas reciprocating engines are proposed to be installed in stages up to a maximum of 120 megawatts (nominal). 

Associated infrastructure included in the proposal includes switch rooms, electrical connections, a new gas heater, extension of fuel piping, water supply systems and other auxiliary equipment. 

Clearing of native vegetation is not proposed.

The Yarnima Power Station occurs within the Nyiyaparli Native Title Determination Area.

Peak annual greenhouse gas emissions are predicted to be: 

  • Scope 1 (power generation): 480,030 tonnes of CO2 equivalent per year (tCO2-e/yr) 

  • Scope 2: NA 

  • Scope 3 (fuel supply): 37,260 tCO2-e/yr. 

Assessment Number
2433
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Chair's Determination
Date published
4. EPA Report on assessment
EPA Report Number
1776
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval