Greenbushes Lithium Mine Expansion

Project
Proposal description

Talison Lithium Australia Pty Ltd (Talison) is proposing to expand the existing Greenbushes Lithium Mine that has been operated for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation and has not previously been assessed by the EPA.

The mine is located in the South West of Western Australia, immediately south of the town of Greenbushes, approximately 250 km south east of Perth, Western Australia.

The proposal Development Envelope will expand from the 1,591 ha authorised under Mining Act 1978 to 1,989 ha (398 ha, 25% increase). The proposal will result in the direct loss of up to 350 ha of native vegetation (State Forest 20).

S43A Change to Proposal

Talison are proposing to change their linear infrastructure through a section 43a application. Talisons are proposing to change the mine haulage route to the site and have included a new mine access road and tailings retreatment plant access road to the expansion. The changes proposed would not increase clearing from that proposed in the existing expansion.

What Happens Next

Following the public comment period and consideration of any comments received, the EPA will determine if it consents to the proponent changing the proposal without a revised proposal being referred.

Assessment Number
2172
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1635
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Ministerial Statement 1111 - Modification to the Mine Development Envelope. Change to proposal approved under S45c on 6 April 2020.

Attachment 2 to Ministerial Statement 1111 - A revised Mine Access Road design; Construction of a worker accomodation village; Relocation of the rehabilitation material stockpiles; and Other changes to the development envelope to include:
A noise bund; A gate; A vegetation screen; Excision of the cemetery and mine lookout; and Access tracks for Cowan Brook Dam. Change to proposal approved under S45c on 15 May 2023.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email