To rezone the amendment area from 'Future Development' to 'Tourism'.
The Shire of Harvey has initiated LPS 2 to replace the existing District Planning Scheme 1.
LPS 2 is proposed to replace the existing Local Planning Scheme 1. The changes are predominantly to update the Scheme to align with the Planning and Development Regulations 2015 and to reflect existing land use. The new scheme proposes a number of changes including new zones, rezoning’s, text updates, scheme provision amendments, additional uses to reflect actual land uses and the introduction of several Special Control Areas.
Local Planning Scheme 8 is proposed to replace the existing Town Planning Scheme 7. The changes are predominantly to update the Scheme to align with the Planning and Development Regulations 2015, ensure consistency with the Greater Bunbury Region Scheme and to reflect existing land use. The new scheme proposes a number of changes including new zones, rezonings, text updates, scheme provision amendments, additional uses to reflect actual land uses and the introduction of several Special Control Areas.
The City of Busselton has initiated Amendment 28 (Omnibus) to Local Planning Scheme No. 21 to
• align with the Planning and Development (Local Planning Scheme) Regulations
2015
• apply zoning and reserve designations that align with the existing development
tenure of landholdings within the City of Busselton
• allow new development in specified areas as a result of the Scheme