Rezoning Lots 1, 2, 7,12,13, 36, 37 and 38 Caporn Street, Wanneroo from Rural Resource to
Urban Development
Removal of Additional Use 52 from the 'Rural Residential' zoned Lot 30 Millbrook Road,
Yallingup and introduction of Special Provision 71 to a portion of Lot 30 Millbrook Road
(proposed Lot 8 Millbrook Road) to include a number of additional 'A' uses.
The Western Australian Planning Commission proposes to introduce an improvement
scheme over the West End of Port Hedland between The Esplanade and Taplin Street. The
scheme will apply greater planning controls in response to the Port Hedland Dust
Management Task Force Report, 2016.
The improvement scheme provides land use and development controls over the proposed Ocean Reef Marina area
The purpose of Amendment No. 88 is to rezone Lot 7, 106 Guildford Road, Maylands from 'Service Station' to 'Medium and High Density Residential' with the R50 density code, amend Schedule 10 to introduce a new Special Control Area (SCA) and associated development provisions covering Lot 7, 106 Guildford Road, Lot 8, 4 and Lot 5, 6 Third Avenue East, Maylands and amend the Scheme Map accordingly.
The Shire of Augusta-Margaret River proposes to add provisions to Schedule 7 of its scheme text to allow for the subdivision of 2 adjacent Rural Residential zoned lots into 1 ha lots. At present the minimum lot size permitted is 3 ha.
Amendment 89 proposes Residential Density Code changesfrom R15/40 and R25/40to R15/60 in the suburbs of Kelmscott and Armadale in the vicinity east of Challis and Sherwood train stations; deletion of a special use zone over a fully developed area; and rezoning of various lots to reflectexisting land use.
Amendment 179 proposes to redevelop the Swan Districts Hospital Site into a number of
uses.
Amendment 52 proposes to include the Additional Use of 'Industry - Noxious (restricted)' to
the Rural zone for Lot 500 Dampier Road, Gap Ridge, with the special condition that the use of the site is restricted to Prescribed Premises No. 13 - Crushing of Building Materials. This is to allow the full operations of the site to continue. The Scheme map and text are to be amended accordingly.