The Shire of Toodyay proposes to replace its existing scheme 4 with an updated scheme 5.
Transfer of zones and reserves within the Shire's LPS 3 into the existing contemporary LPS 4.
Some changes to zones or reserves are proposed in LPS 4.
The City of Kalgoorlie-Boulder has initiated Town Planning Scheme 2 (TPS 2) to align with the
Planning and Development (Local Planning Scheme) Regulations 2015 (Regulations). TPS 2
proposes several zones where development will be subject to development provisions to
ensure compatibility and compliance with the Regulations and to limit the potential of
detrimental effects on sensitive land uses.
The Shire of Mingenew has initiated Local Planning Scheme No. 4 to align with the Planning and Development (Local Planning Scheme) Regulations 2015. No new development is proposed as a result of the Scheme. The Scheme proposes to apply zoning and reserve designations that align with the existing development tenure of landholdings within the Shire of Mingenew
The Shire of Halls Creek has initiated Local Planning Scheme 2 to align with the Planning and Development (Local Planning Scheme) Regulations 2015. No new development is proposed as a result of the Scheme. It proposes to apply zoning and reserve designations that align with the existing development tenure of landholdings within the Shire of Halls Creek.
Review of scheme No. 2 with changes to the scheme text and maps.
The Western Australian Planning Commission (WAPC) has resolved to prepare the Ashburton North Strategic Industrial Area (ANSIA) Improvement Scheme which will create a strategic industrial estate comprising major hydrocarbon processing industries and synergistic services and facilities.
The purpose of the Wungong Urban Water Redevelopment Scheme 2006 in broad terms is to provide for the orderly and proper control of development within the Scheme area. The Scheme area consists of approximately 1500 hectares (ha) of rural land in Brookdale. Most of the site is substantially cleared low lying palusplain with the Wungong River traversing the site. The site is mostly in the Southern River catchment of the Swan and Canning Rivers system. A small portion drains to the Birrega Main Drain in the Peel-Harvey catchment.
This scheme was previously known as the 'Brookdale Redevelopment Scheme 2005 Amendment 1 (Brookdale Master Plan)'
The Shire of Harvey proposes to amend District Planning Scheme No. 1 by rezoning Lot 5 Old Coast Road, Leschenault (Pt Loc 23, Plan 7938) from “Tourist” zone and “Recreation” reserve to “Residential Development” zone, “Tourist” zone, “Recreation and Conservation” reserve and “Modified Water Body”.
The Concept Development Plan associated with Amendment No. 13 comprises several components:
Appeals were allowed in part on 8 May 2006 for further assessment in relation to risks posed by acid sulphate soils. This assessment has been superseded by the assessment of Harvey District Planning Scheme No. 1 Amendment No 13.