The purpose of the Wungong Urban Water Redevelopment Scheme 2006 in broad terms is to provide for the orderly and proper control of development within the Scheme area. The Scheme area consists of approximately 1500 hectares (ha) of rural land in Brookdale. Most of the site is substantially cleared low lying palusplain with the Wungong River traversing the site. The site is mostly in the Southern River catchment of the Swan and Canning Rivers system. A small portion drains to the Birrega Main Drain in the Peel-Harvey catchment.
This scheme was previously known as the 'Brookdale Redevelopment Scheme 2005 Amendment 1 (Brookdale Master Plan)'
To amend reservations and zonings in the Metropolitan Region Scheme consistent with the Alkimos-Eglinton Structure Plan.
The main elements of the amendment with the potential to impact on the environment are:
The Shire of Kalamunda proposes to rezone approximately 138 hectares (ha) in High Wycombe to Urban Development.
Rezoning from Community Purposes to Residential R30 Lot 503 Warnbro Sound Avenue, Port Kennedy.
Hazelmere Enterprise Area Structure Plan Precinct 9A - Bushmead
Keralup 'Special Control Area'
Reclassifying Portions of Lot 911 Midland Road, Hazelmere.
Hazelmere Enterprise Area Structure Plan Precinct 2A and 2B - Helena River Precinct
Hazelmere Enterprise Area Structure Plan Precinct 7 - HEA South