This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 25, 1989
Northcorp Limited, the proponent, proposes to redevelop 42 ha of land bounded by Collier Road and Railway Parade, Bassendean and a small wedge of land bounded by Scadden and Iolanthe Streets for subdivision as a commercial and industrial park. Read more...Last updated: October 11, 1989
The proposal is to extend AMC Mineral Sands' existing heavy mineral sand mining operation. The proposed extension is 5 km west of the existing operation at Eneabba, which lies 250 km north of Perth. Expansion of the mining operation will necessitate an expansion of the existing dry processing plant at Narngulu near Geraldton. lt is proposed to mine 200 million tonnes of ore over a 14 year period, resulting in a 40% increase in production at the Eneabba operations. Mining of the deposit... Read more...Last updated: October 4, 1989
Pursuant to Section 46(1) of the, Environmental Protection Act 1986, , the Minister for Environment has requested the Environmental Protection Authority to inquire and report on the suggestion that Condition 1, point 1 of Ministerial Statement 33 , which requires that the proponent carry out its manufacturing process between the hours of 6.00 am and 10.00 am, be changed so that the hours of operation are between 6.00 am and 10.00 pm. Read more...Last updated: September 29, 1989
The Department of Defence proposes to develop additional naval facilities on Garden Island, comprising Stage 2 and Stage 3 of the long term development program for HMAS Stirling. Read more...Last updated: September 26, 1989
Sunland Pty Ltd has proposed the development of a golf course and residential estate on Murray Location 17, immediately adjacent to and south of, the existing Murray Lakes Canal Development in the Shire of Murray. Read more...Last updated: September 18, 1989
Cable Sands (WA) Pty Ltd has submitted a proposal to mine a deposit of mineral sands approximately 5km to the east of Busselton, near the junction of Vasse and Bussell Highways. Read more...Last updated: August 28, 1989
The proposal is for an intensive ten-month programme aimed at total eradication of the limited infestation of Queensland fruit fly in the Perth metropolitan area. The proposed eradication programme is based on baits formulated with either male only or combined male and female lures and containing between 1 and 2 g of the insecticide malathion, followed by a strategic release of sterile male fruit flies. Urgent implementation of the eradication programme is proposed to avoid the spread of this... Read more...Last updated: August 7, 1989
The proposal is to subdivide land on West Parade, South Guildford adjacent to the Helena River and west of the Rosehill Country Club, and is currently zoned Rural. The northern portion of the land is affected by System 6 Recommendation M33 (Helena River Guildford to Darlington) and is reserved for Parks and Recreation in the Metropolitan Region Scheme. The proposal is to subdivide the land to create approximately 14 rural/residential lots no smaller than 4,000 m 2 and cede 8.26 hectares (53% of... Read more...Last updated: July 15, 1989
Proposal by Australian Gold Reagents Pty Ltd to double the size of its existing sodium cyanide plant at Kwinana to a capacity of 30,000 tonnes of sodium cyanide per annum and to use existing rail/road routes to transport it as a 30% solution to gold mines in the state. Read more...Last updated: July 12, 1989
Argyle Diamond Mines Pty Ltd has submitted a proposal to recommence the mining of alluvial diamonds from Smoke and Limestone Creeks within its Argyle mining lease. The project is expected to process about 5 million tonnes of gravel for a return of approximately 5.3 million carats over a three year period, beginning about July 1989. Read more...Last updated: June 27, 1989
Minora Resources NL has submitted a proposal to drill a third exploration oil well in its lease, EP 325, Exmouth Gulf. The well is located 13 km south east of the town of Exmouth. Minora propose to use a jack-up rig and drilling would take about 24 days to complete. Drilling is proposed during the winter of 1989. Read more...Last updated: June 26, 1989
The State Planning Commission has proposed an amendment to the Metropolitan Regional Scheme (MRS) to create the reserve for the Kwinana Freeway extension from Thomas Road to the southern boundary of the Metropolitan Region, north east of Mandurah. Read more...Last updated: May 15, 1989
Proposal to undertake a seismic survey in an area which partially overlaps the south-eastern corner of Cape Range National Park. The proposal involves 12.9 km of seismic survey in the National Park using the vibroseis technique. This would require some ground disturbance, primarily by walking a bulldozer along the survey lines with its blade raised in order to press the vegetation down rather than clearing it. Three 50 m drill holes would be required but no drilling mud or additives would be... Read more...Last updated: May 3, 1989
In November 1987 the TiO 2 Corporation submitted to the Environmental Protection Authority an ERMP describing a proposal which included the establishment of a mineral sands dry separation plant at a site just north of Muchea on the Brand Highway. The EPA assessed that proposal subject to the implementation of several commitments and recommendations (EPA Bulletin 330, March 1988) and found it environmentally acceptable. Subsequently the proponent submitted a proposal for the establishment of a... Read more...Last updated: May 1, 1989
The proposal which Nufarm-Coogee has submitted for assessment is as follows: Separation of conditions and commitments in Ministerial Statement 1 , devolving those related to the Chlor-Alkali Plant to Nufarm-Coogee, with the remainder continuing to be the responsibility of SCM Chemicals Ltd; Changing commitments for a foam suppression system in the chlorine storage area. remotely operated valves (ROVs) on the liquified chlorine line. and excess flow valves on the liquified chlorine line; and,... Read more...Last updated: April 1, 1989
Esplanade (Mandurah) Pty Ltd proposes to develop a canal estate at Halls Head Mandurah called Port Mandurah. This project would involve single residential water front allotments, fronting onto a network of canals, linked to the Mandurah Inlet Channel and includes a tourist development site and a village centre, encompassing a total area of 113.8 hectares. Read more...Last updated: March 30, 1989
The proposal is for the construction of a standard 22 kV three phase wood pole distribution line from Northcliffe to the Windy Harbour settlement, a distance of approximately 30 kilometres. For much of its length, the powerline would pass through the D'Entrecasteaux National Park and an area which has been proposed as national park under the Department of Conservation and Land Management's (CALM) Shannon Park and D'Entrecasteaux National Park Management Plan 1987/88 and the... Read more...Last updated: March 14, 1989
The State Energy Commission is proposing to establish a gas turbine power station at Pinjar, north east of Wanneroo. At the completion of the construction in 1994, the station will comprise eight 35 MW gas turbine units. Read more...Last updated: March 1, 1989
Proposal to build a new horticultural college of TAFE at Bull Creek in the City of Melville Read more...