This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 16, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2022 to 2026. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. The 2022-26 MMP was approved, subject to exclusions, through the State Agreement Act framework in September 2022, and the proposal is currently being... Read more...Last updated: August 16, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...Last updated: November 24, 2022
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: December 18, 2017
The Wagerup Alumina Refinery revised proposal is to construct and operate the Wagerup Alumina Refinery to a maximum production capacity of 4.7 million tonnes per annum (Mtpa) and its associated bauxite mining. The proponent for the proposal, Alcoa of Australia (Alcoa), requested an extension of the Time Limit of Authorisation for substantial commencement (now referred to as the Time Limit of Proposal Implementation) to be extended by five years to 14 September 2021 as the third production unit... Read more...Last updated: September 27, 2016
The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...Last updated: February 25, 1988
The proposal is to establish a gold mining operation of up to 2 million tonnes per annum with a project life of 4-5 years. The mine is proposed to be located in State Forest, with processing and waste disposal facilities located on private land. The mine would be adjacent to the currently operating Boddington Gold Mines, and would mine the same ore body. The proposed mine is located in the eastern, low rainfall. section of the Darling Range and also within the catchment area of the 34 Mile... Read more...