Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • EIA Practice Guide
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
      • Environmental advice on the draft Carabooda District Structure Plan
  • News Centre

Filter by industry sector:

  • Iron Ore (25) Apply Iron Ore filter
  • Infrastructure (16) Apply Infrastructure filter
  • Utilities (10) Apply Utilities filter
  • Industrial (8) Apply Industrial filter
  • Land use (8) Apply Land use filter
  • Power generation (8) Apply Power generation filter
  • Mineral sands (6) Apply Mineral sands filter
  • Waste management (6) Apply Waste management filter
  • Bauxite (5) Apply Bauxite filter
  • Copper (5) Apply Copper filter
  • Gold (5) Apply Gold filter
  • Oil and gas (5) Apply Oil and gas filter
  • Sand, rock, gravel and clay (5) Apply Sand, rock, gravel and clay filter
  • Salt (4) Apply Salt filter
  • Nickel (3) Apply Nickel filter
  • Lithium (2) Apply Lithium filter
  • Potash (2) Apply Potash filter
  • Rare earth elements (2) Apply Rare earth elements filter
  • Manganese (1) Apply Manganese filter
  • Molybdenum (1) Apply Molybdenum filter

Filter by current status:

  • Decision on whether to assess has been published (30) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (30) Apply Ministerial Statement published filter
  • Environmental Scoping Document approved (17) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (12) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - appeals closed (8) Apply EPA Report and Recommendations released - appeals closed filter
  • Assessment on Proponent Information – public submission period closed (6) Apply Assessment on Proponent Information – public submission period closed filter
  • Public Environmental Review period closed (6) Apply Public Environmental Review period closed filter
  • Assessment on Proponent Information – Request for More Information published (4) Apply Assessment on Proponent Information – Request for More Information published filter
  • EPA Report and Recommendations released - appeals open (2) Apply EPA Report and Recommendations released - appeals open filter
  • Response to submission published (2) Apply Response to submission published filter
  • Report and recommendations in preparation (1) Apply Report and recommendations in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Inland Waters filter Inland Waters
  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (109) Apply Flora and Vegetation filter
  • Terrestrial Fauna (106) Apply Terrestrial Fauna filter
  • Subterranean Fauna (47) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (43) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (20) Apply Marine Environmental Quality filter
  • Marine Fauna (18) Apply Marine Fauna filter
  • 37 (17) Apply 37 filter
  • Benthic Communities and Habitats (17) Apply Benthic Communities and Habitats filter
  • Landforms (16) Apply Landforms filter
  • 3144 (14) Apply 3144 filter
  • Coastal Processes (11) Apply Coastal Processes filter
  • Greenhouse Gas Emissions (10) Apply Greenhouse Gas Emissions filter
  • Human Health (8) Apply Human Health filter
  • Air Quality (4) Apply Air Quality filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (6) Apply BHP Iron Ore Pty Ltd filter
  • Alcoa of Australia Limited (3) Apply Alcoa of Australia Limited filter
  • Image Resources NL (3) Apply Image Resources NL filter
  • Main Roads Western Australia (3) Apply Main Roads Western Australia filter
  • Atlas Iron Pty Ltd (2) Apply Atlas Iron Pty Ltd filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Cleanaway Solid Waste Pty Ltd (2) Apply Cleanaway Solid Waste Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Pilbara Energy (Generation) Pty Ltd (2) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Water Corporation (2) Apply Water Corporation filter
  • Agrimin Limited (1) Apply Agrimin Limited filter
  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • Alkina Holdings Pty Ltd (1) Apply Alkina Holdings Pty Ltd filter
  • Brikmakers (BGC Australia Pty Ltd) (1) Apply Brikmakers (BGC Australia Pty Ltd) filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • City of Gosnells (1) Apply City of Gosnells filter
  • Commissioner of Main Roads (1) Apply Commissioner of Main Roads filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Eastern Metropolitan Regional Council (1) Apply Eastern Metropolitan Regional Council filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) (1) Apply Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) filter
  • Hanson Construction Materials Pty Ltd (1) Apply Hanson Construction Materials Pty Ltd filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Keysbrook Leucoxene Pty Ltd (1) Apply Keysbrook Leucoxene Pty Ltd filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • Newmont Boddington Gold Pty Ltd (1) Apply Newmont Boddington Gold Pty Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Public Transport Authority of Western Australia (1) Apply Public Transport Authority of Western Australia filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Rottnest Island Authority (1) Apply Rottnest Island Authority filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Salt Lake Potash Limited (1) Apply Salt Lake Potash Limited filter
  • SF Irrigation Cooperative Limited (1) Apply SF Irrigation Cooperative Limited filter
  • Shire of Broome (1) Apply Shire of Broome filter
  • South32 Worsley Alumina Pty Ltd (1) Apply South32 Worsley Alumina Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • Talison Lithium Australia Pty Ltd (1) Apply Talison Lithium Australia Pty Ltd filter
  • Tellus Holdings Ltd (1) Apply Tellus Holdings Ltd filter
  • Wasterock Pty Ltd; Hazelland Pty Ltd (1) Apply Wasterock Pty Ltd; Hazelland Pty Ltd filter

Filter by region:

  • Pilbara (42) Apply Pilbara filter
  • Perth (20) Apply Perth filter
  • South West (17) Apply South West filter
  • Mid West (12) Apply Mid West filter
  • Goldfields Esperance (8) Apply Goldfields Esperance filter
  • Kimberley (7) Apply Kimberley filter
  • Peel (5) Apply Peel filter
  • Gascoyne (3) Apply Gascoyne filter
  • Great Southern (2) Apply Great Southern filter
  • Wheatbelt (2) Apply Wheatbelt filter

Filter by last updated:

  • 2025 (47) Apply 2025 filter
  • 2024 (27) Apply 2024 filter
  • 2023 (16) Apply 2023 filter
  • 2022 (5) Apply 2022 filter
  • 2021 (9) Apply 2021 filter
  • 2020 (7) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2015 (1) Apply 2015 filter
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. Inland Waters

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Anketell Road Upgrade (Leath Road to Kwinana Freeway)

Last updated: August 18, 2025

Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...

Eramurra Solar Salt Project

Last updated: August 15, 2025

Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...

Northern Terminal to Neerabup Terminal 330kV Transmission Line

Last updated: August 7, 2025

The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...

Karara Iron Ore Project – Mine Life Extension

Last updated: August 4, 2025

Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...

Ridley Magnetite Project

Last updated: August 4, 2025

The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...

Western Green Energy Hub

Last updated: July 22, 2025

The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...

Hemi Gold Project

Last updated: July 21, 2025

De Grey Mining Ltd proposes to construct and operate the Hemi Gold Project (the Project) located approximately 85 km south of Port Hedland, in the Pilbara Region of WA. The Project involves the excavation of open pits, mine dewatering, surplus water management including reinjection and controlled discharge. Associated supporting infrastructure includes an integrated waste landform tailings storage facility, waste rock landforms, low-grade stockpiles, airstrip, accommodation village, sealed... Read more...

Smiths Beach Project, Yallingup – Coastal Tourism Village

Last updated: June 26, 2025

Smiths 2014 Pty Ltd proposes to develop Lot 4131 Smiths Beach Road, Yallingup (City of Busselton) into a coastal tourism village, including: Hotel accommodation and wellness centre Campground 61 holiday homes Community hub, café, bakery and general store Cape to Cape welcome centre Surf Lifesaving Club facilities The proposal is located at the southern end of Smiths Beach, adjacent to the Leeuwin-Naturaliste National Park. The total proposed development envelope is 41.79 hectares (ha). The... Read more...

Gnarabup Tourism Development – Resort and Beach Village

Last updated: June 18, 2025

Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...

Marillana Creek (Yandi) Life of Mine Proposal significant Amendment

Last updated: June 9, 2025

The Marillana Creek (Yandi) Life of Mine Proposal is a significant amendment located approximately 90 kilometres (km) northwest of the town of Newman. BHP Iron Ore Pty Ltd proposes to extend existing iron ore mining operations approved under, Ministerial Statement 679, and as amended by, Ministerial Statement 1039, . The proposal includes the expansion of operations at the approved Marillana Creek (Yandi) operation to mine the entire Yandi orebody within Mining Lease 270SA. This will include... Read more...

East Pilbara Generation Hub

Last updated: June 6, 2025

The proposal is to construct and operate a wind farm and linear infrastructure to provide renewable energy to Fortescue mining operations within the Pilbara. The proposal comprises of wind turbines, 220 kV transmission lines, substations and switchyards, 33 kV reticulation lines, a borefield, roads, pipelines, corridors of overhead lines, battery energy storage, accommodation camps, wastewater treatment plant, optional airstrip and supporting infrastructure. The Proposal is located... Read more...

Broome Future Energy System

Last updated: June 3, 2025

Horizon Power proposes to construct and operate the Broome Future Energy System (FES) for energy supply to the town of Broome within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 90 megawatts (MW), battery energy storage systems (BESS) and a network connection route. The solar PV and BESS will be installed at a site approximately 10 km north of Broome. A network connection route will connect the solar PV and BESS to the... Read more...

Rottnest Island Worker Accommodation

Last updated: May 19, 2025

The Rottnest Island Authority (RIA) propose to develop workers accommodation to support island businesses, enhance visitor experience and meet growing tourism needs for Wadjemup / Rottnest Island. The proposal is for 149 accommodation units for up to 336 people. The worker accommodation will be available specific workers who are required to reside on Rottnest Island for the purpose of delivering essential services to visitors and ensuring continued operations of the island. The proposal area is... Read more...

Bauxite mining on the Darling Range in the southwest of WA for the years 2022 to 2026

Last updated: May 14, 2025

The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2022 to 2026. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. The 2022-26 MMP was approved, subject to exclusions, through the State Agreement Act framework in September 2022, and the proposal is currently being... Read more...

Nyidinghu Iron Ore Mine

Last updated: May 5, 2025

Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...

Lamb Creek Iron Ore Project

Last updated: April 14, 2025

The proposal is an open pit iron ore mine located approximately 130 km northwest of Newman, in the East Pilbara. The mine will produce up to 10 million tonnes per annum (Mtpa) of crushed and screened iron ore over a period of three to five years. The proposal includes construction of a multi-stage crushing and screening process plant and associated mine infrastructure including offices, water pipelines, storage and equipment areas, power generation and accommodation village. Iron ore product... Read more...

Arrowsmith Hydrogen Project

Last updated: April 13, 2025

Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...

East Hamersley Railway Project

Last updated: March 27, 2025

The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...

Mining Area C – Southern Flank Significant Amendment

Last updated: March 24, 2025

BHP Iron Ore Pty Ltd is proposing to significantly amend the approved proposal at Mining Area C, located approximately 120 km north-west of Newman. The approved proposal consists of above and below water table mine pits and associated infrastructure, groundwater abstraction, dewatering and surplus water infrastructure, ore processing facilities, ore transportation infrastructure, haul and access roads, and ore and topsoil stockpiles. The significant amendment proposal involves increased... Read more...

Turkey Point Access Road and Bridge

Last updated: March 17, 2025

The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.