This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: May 16, 2023
Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...Last updated: December 19, 2022
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: September 6, 2022
Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: February 1, 2022
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...