Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (4) Apply Infrastructure filter
  • Iron Ore (3) Apply Iron Ore filter
  • Utilities (2) Apply Utilities filter
  • Bauxite (1) Apply Bauxite filter
  • Industrial (1) Apply Industrial filter
  • Mineral sands (1) Apply Mineral sands filter
  • Oil and gas (1) Apply Oil and gas filter
  • Potash (1) Apply Potash filter
  • Power generation (1) Apply Power generation filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • Ministerial Statement published (14) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter

Filter by relevant environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • Flora and Vegetation (10) Apply Flora and Vegetation filter
  • Social Surroundings (10) Apply Social Surroundings filter
  • Terrestrial Fauna (7) Apply Terrestrial Fauna filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • Inland Waters (4) Apply Inland Waters filter
  • Greenhouse Gas Emissions (3) Apply Greenhouse Gas Emissions filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • Alinta Cogeneration (Wagerup) Pty Ltd (1) Apply Alinta Cogeneration (Wagerup) Pty Ltd filter
  • Alinta DEWAP Pty Ltd (1) Apply Alinta DEWAP Pty Ltd filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • AWE Perth Pty Ltd (1) Apply AWE Perth Pty Ltd filter
  • Covalent Lithium Pty Ltd (1) Apply Covalent Lithium Pty Ltd filter
  • Image Resources NL (1) Apply Image Resources NL filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • NewGen Neerabup Pty Ltd (1) Apply NewGen Neerabup Pty Ltd filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Piper Preston Pty Ltd (1) Apply Piper Preston Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (1) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • VBX Limited (1) Apply VBX Limited filter
  • Water Corporation (1) Apply Water Corporation filter

Filter by region:

  • Pilbara (5) Apply Pilbara filter
  • Perth (4) Apply Perth filter
  • Mid West (2) Apply Mid West filter
  • Peel (2) Apply Peel filter
  • Kimberley (1) Apply Kimberley filter
  • South West (1) Apply South West filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2021 filter 2021
  1. Home
  2. Proposal search
  3. Air Quality
  4. 2021

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

330MW Gas-Fired Power Station, Neerabup (s46) [2239]

Last updated: November 25, 2021

Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...

Alkimos Wastewater Treatment Plant-Site B (S46) [2278]

Last updated: November 23, 2021

Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...

Waitsia Gas Project Stage 2

Last updated: October 4, 2021

The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...

Port Hedland Power Station Expansion

Last updated: September 13, 2021

Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...

Sino Iron Mine Continuation Proposal

Last updated: September 1, 2021

The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...

Devil Creek Gas Development Project

Last updated: September 1, 2021

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...

Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Last updated: August 9, 2021

The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...

Covalent Lithium Hydroxide Refinery

Last updated: July 15, 2021

The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...

Boonanarring Mineral Sands Mine

Last updated: June 24, 2021

Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...

Wuudagu Bauxite Project

Last updated: June 9, 2021

VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...

Lake Way Sulphate of Potash Project

Last updated: April 28, 2021

Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...

West Angelas Iron Ore Project Deposits C, D and G

Last updated: April 16, 2021

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.   Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional  ... Read more...

Wagerup Cogeneration Project

Last updated: April 6, 2021

Read more...

High Street Upgrade

Last updated: February 3, 2021

Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...

Pilbara Energy Generation Power Station

Last updated: February 1, 2021

PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...

Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining (728 and 1069) (S46) [2179]

Last updated: January 7, 2021

Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.