This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 23, 2022
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: August 9, 2021
The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: September 27, 2016
The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...Last updated: December 14, 2015
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: September 21, 2015
The proposal is to upgrade the Pinjarra Alumina Refinery. The proposal involves an upgrading of the seed filtration facility to improve its efficiency in order to increase the alumina production by approximately 17% to approximately 4.2 million tonnes per annum. This will require an increase in the bauxite mining rate at Alcoa’s Huntly bauxite mine and additional bauxite grinding, slurry storage and calcination facilities. Read more...Last updated: August 5, 2015
The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: July 12, 2007
The proposal is for the construction and operation of an ethanol bio-refinery on a 19 hectare site in the Kwinana Industrial Area. Read more...Last updated: December 4, 2006
Iluka Resources Ltd (Iluka) has sought to update the 1992 Ministerial Statement 291 to reflect the current operating parameters and licence conditions at the North Capel Synthetic Rutile Plants 1 and 2 site via a review of the conditions and commitments in that Ministerial statement. Accordingly, the Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice to him under Section 46(6) of the, Environmental Protection Act 1986 Read more...Last updated: May 17, 2006
The proposal is for a silicon smelter at Kemerton and quartzite mine at Moora. Inquiry under s46 to amend the environmental conditions of Ministerial Statement 27 to allow the proponent, on an as-needed basis, to bypass the baghouse and vent furnace off-gases directly to the atmosphere for up to 50 hours per year. Read more...Last updated: October 17, 2005
Proposal by Wambo Power Ventures Pty Ltd (WPV) to construct and operate a 320 megawatt (MW) continuous base load, combined cycle gas turbine (CCGT) power station situated in Kwinana. Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...