This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 17, 2025
The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...Last updated: March 13, 2025
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: March 7, 2025
Chichester Metals Pty Ltd is proposing to construct and operate an iron ore mine approximately 55 km north-west of Newman, and 30 km south of Fortescue’s existing Nyidinghu project in the Pilbara region. The proposal would require a disturbance footprint of 12,487 ha and is located within a 42,331 ha mine development envelope. The proposal is located within the Nyiyaparli and Nyiyaparli #3 Native Title determination area (WCD 2018/008) The proposal includes both above and below water table open... Read more...Last updated: February 25, 2025
The proposal is for the development of a titanium minerals mine at Tutunup, approximately 20 km east of Busselton. The proposal has the following main components: disturbance of 120 hectares of mainly cleared agricultural land; construction of water and fines dams, and topsoil, tails and overburden stockpiles; dewatering and mining, using dry mining techniques at up to two million tonnes per annum; abstraction of groundwater from the Yarragadee aquifer for process use; haulage of the Heavy... Read more...Last updated: February 17, 2025
Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill site and to the... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: January 29, 2025
The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: January 20, 2025
Colchester Pty Ltd propose to construct a large format hardware and retail development at Lot 100 and 256 Clarke Road within the Station Road commercial precinct located 900 metres south of the Margaret River town site. The proposal includes buildings internal roads, hardstand areas and landscaping. The proposal site is 2.86 hectares (ha) and is bounded by existing commercial business to the north and south, the South Regional TAFE Margaret River Campus to the east and remnant vegetation within... Read more...Last updated: January 13, 2025
Lot 123 Mortimer Road Casuarina (Lot 123) is 45 hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lot of 7.9 hectares (ha) and a balance lot for residential development. Lot 123 contains excellent quality remnant Banksia woodland vegetation, threatened fauna habitat, and a conservation category wetland. Read more...Last updated: January 6, 2025
The Orebody 29/30/35 Significant Amendment proposal is approximately 7 kilometres west-south-west of Newman in the Pilbara region next to existing Mt Whaleback mining operations. BHP Iron Ore Pty Ltd proposes to continue and expand existing iron ore mining operations approved under Ministerial Statement 963: Orebody 29/30/35 Mining Below Watertable, published 18 March 2014. The proposal includes the expansion of operations at Orebody 29 and 30 (above and below the water table), the addition of... Read more...Last updated: December 20, 2024
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: December 19, 2024
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: December 18, 2024
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: December 10, 2024
The Proposal involves the development of a greenfields Sulphate of Potash fertiliser operation which is currently designed to operate for a 20-year period. The Proposal involves the on-lake development of trenches and solar evaporation ponds for brine extraction and Sulphate of Potash production. The off-lake development includes a processing plant, associated site infrastructure and access roads for trucking Sulphate of Potash product to Wyndham Port. A northern linear access corridor will... Read more...Last updated: December 6, 2024
Aigle Royal propose to develop Lots 11 and 74 Beenyup Road, Banjup for residential development and conservation. The site adjoins Jandakot Regional Park. 10.25 hectares of the site is proposed for residential development and a wetland buffer. 23 hectares is proposed to be managed for conservation. Read more...Last updated: December 5, 2024
Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station,... Read more...Last updated: December 2, 2024
Consolidated Minerals Pty Ltd the proponent) propose to develop the Woodie Continued Operations Project. The proposal is an expansion of the existing Woodie Woodie Manganese Mine operations (Pilbara Manganese Pty Ltd, a wholly owned subsidiary of Consolidated Minerals Pty Ltd) which is not subject to a Ministerial Statement issued under Part IV of the Environmental Protection Act 1986 (EP Act). The proposal is located approximately 100 km east of Marble Bar and Nullagine and 400 km south east... Read more...Last updated: November 27, 2024
The proposal is to conduct a 3D seismic survey within an area consisting of private land, the proposed Big Soak Plain Conservation Park and the Watheroo National Park approximately 60 kilometres east of Jurien Bay. The survey would involve the rolling of vegetation for vehicle access to the seismic lines. Read more...Last updated: November 27, 2024
Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia. The proposal includes a conceptual footprint of approximately 4,700 hectares (ha) to support the development, operation and closure of two new AWT iron ore deposits within a proposed Development Envelope of approximately 14,085 ha. The key... Read more...