The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: September 14, 2020
Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 8, 2020
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: May 6, 2020
Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: April 1, 2019
Changes to condition 7 (Restricted areas and management of Tetratheco paynteroe ssp. paynterae at the Windarling Range) to allow future ground disturbing access to the restricted 'Area B', and condition 10 (Residual impacts and risk management measures) in terms of revised research and management offset measures for threatened flora species. Read more...Last updated: December 9, 2016
Westralian Iron Pty Ltd proposes to develop three bulk sample pits at Koolanooka South (Figure 1). The project site is located approximately 20 kilometres (km) due east of Morawa and 370 km north of Perth. Bulk sampling is required to assist with future planning and design for the proposed development and to provide sufficient material for a test regime to fully understand the characteristics of the ore to enable an efficient Magnetite processing plant to be designed. The bulk sampling... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: January 12, 2015
The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted this proposal back to the EPA for assessment at the level of Public Environmental Review (8 weeks). Access the re-assessment of this proposal here. Read more...Last updated: February 23, 2011
The proposal is to develop an open-cut lead carbonate mine and processing facilities approximately 30 kilometres west of the Wiluna townsite to produce a lead concentrate. The lead concentrates will be refined at the Wiluna minesite to produce lead metal, or alternatively will be transported by road to the Geraldton Port and exported. Post-assessment changes to the proposal stipulate that the lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked... Read more...Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: September 14, 2001
The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of Leinster. Read more...