Last updated: December 30, 2014
The proposal is to construct a mineral sands mine at Cataby approximately 150 km north of Perth. The project will consist of a series of 13 open pits over approximately 25 kilometres, which will be progressively mined by dry mining techniques. The proposal will produce approximately 760 to 780 kilotonnes of Heavy Mineral Concentrate per annum. Read more...Last updated: November 29, 2005
Kemerton silica sand mining revised proposal - additional mining areas and transfer of land for conservation Read more...Last updated: February 25, 2008
The implementation of a one-year, pilot scale yellowfin tuna seacage aquaculture trial in the Zeewijk Channel, Abrolhos Islands (approximately 75 kilometres west of Geraldton). Read more...Last updated: July 2, 2002
The proposal is to undertake a hydrogeological research programme at the Marandoo mine site. Marandoo mine site, on Marandoo Mining Lease (M272SA), is 35 kilometres north-east of the town of Tom Price in the Pilbara, and abuts Karijini National Park. Read more...Last updated: February 3, 2015
The proposal is to develop an open cut iron ore mining operation at Orebody 18 on Mineral Lease 244SA involving mining 116 Mt of ore at a rate of up to 15 Mtpa for a mine life of 12 to 15 years. Support infrastructure includes an 8 km rail spur and crushing, screening and load out facilities. Read more...Last updated: August 28, 2014
The proposal is to rehabilitate the Beenup Titanium Minerals Project Area located 17km north-east of Augusta in the Shire of Augusta-Margaret River. The Beenup Rehabilitation Project is located on retained portions of Mining Leases 70/574 and 70/575. Inquiry under s46 to amend Ministerial Statement 140 . Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: September 13, 2013
The proposal is for the development of a 300 hectare site at Port Geographe, including a main harbour with mooring and public boat launching facilities, a waterway residential subdivision with canal and ordinary residential blocks, holiday accommodation, public open space and an estuary conservation zone. Inquiry under s46 regarding a requested change to environmental conditions of Ministerial Statement 89 . Read more...Last updated: October 6, 1992
The proposal is for an iron ore mining operation at Marandoo, 35 kilometres east-north-east of the town of Tom Price, in an enclave within Karijini National Park, and a railway line from the existing Paraburdoo-Dampier railway line, to service Marandoo. The rail line would then continue past Marandoo to connect with proposed future mines in the Central Pilbara. Read more...Last updated: January 20, 2011
The proposal is to establish a silica sand mining operation at Gnangara, approximately 20 km north-east of Perth. Approximately 80% of the proposed project area is located over State Forest No 65 with the remaining 20% of the area covering private land. The area of State Forest which would be affected by the proposal is zoned 'State Forest' under the Northern Forest Region-Regional Management Plan 1987-1997. This allows for multiple land use including water production. The proposal is... Read more...Last updated: March 25, 2015
Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 799 . Read more...Last updated: September 9, 2013
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: August 15, 2013
Construct and operate a shallow open pit iron ore mine and associated infrastructure on the Mt Gibson Pastoral Lease in the Mid-West of Western Australia. Read more...Last updated: August 9, 2013
Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...Last updated: July 13, 2000
The proposal includes gold mining developments within a defined project area on Lake Lefroy a naturally occurring salt lake approximately 7 kilometres south-east of Kambalda. Thirteen sites have already been identified for development of open-cut gold mining pits, some with underground portals and mining. Additional sites may be identified within the defined project area. Waste rock dumps, access infrastructure and mining support facilities such as workshops and contractor's compounds will... Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: February 28, 2012
Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: May 5, 2020
The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...