Last updated: September 16, 2020
Ashton Rare Earths Pty Ltd wishes to extend the time limit of environmental approval for the proposed Rare Earths Mining and Beneficiation at Mt Weld and Secondary Processing at Meenaar project for a further three years. Read more...Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: September 14, 2020
Change to condition 8-4 of Ministerial Statement 892, relating to the removal of one inactive Malleefowl mound. Read more...Last updated: September 14, 2020
Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...Last updated: September 10, 2020
The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...Last updated: September 10, 2020
The Proposal involves the development of a greenfields Sulphate of Potash fertiliser operation which is currently designed to operate for a 20-year period. The Proposal involves the on-lake development of trenches and solar evaporation ponds for brine extraction and Sulphate of Potash production. The off-lake development includes a processing plant, associated site infrastructure and access roads for trucking Sulphate of Potash product to Wyndham Port. A northern linear access corridor will... Read more...Last updated: September 10, 2020
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: September 7, 2020
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: September 7, 2020
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: September 7, 2020
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines... Read more...Last updated: September 4, 2020
A proposed rare earth elements (REE) mine and ore processing facility at Browns Range, approximately 160 kilometres (km) southeast of Halls Creek in the Shire of Halls Creek. Read more...Last updated: September 2, 2020
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: August 31, 2020
The West Bay Barge Landing has been in operation since 1944 and is located approximately 7 km east of the Mungalalu Truscott Airbase, in the Kimberley Region. The site is approximately 520 km west southwest of Darwin and 617 km northeast of Broome and is located on the Anjo Peninsula on the northern tip of Western Australia. The proponent, Mungalalu Truscott Airbase Pty Ltd, is proposing to dredge 22,000m 3 of the barge landing to restore safe navigable depths. Disposal of dredged material is... Read more...Last updated: August 24, 2020
King Street Trust is applying for Planning Consent and an Extractive Industries Licence for sand extraction on Lot 226, Paterson Road, Nambeelup, for a period of 10 years. Lot 226 Paterson Road is approximately 155 hectares (ha) in size. The proposal will require a total of 24.5 ha of proposed disturbance (excavation) including 12.7 ha of native vegetation clearing. The depth of excavation will be between 1 to 5 metres below natural land surface, with the rate of excavation between 50 000 and... Read more...Last updated: August 20, 2020
The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...Last updated: August 12, 2020
The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...Last updated: August 10, 2020
The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...Last updated: August 10, 2020
The proposal is to construct and operate a multi-use motorsport complex on Lot 78 Punrak Road Keysbrook, and to redirect stormwater to Lot 400 Wigg Road Keysbrook. The proposal would be used for road safety driver training, amateur car events, a go-kart track, V8 supercar events, motorbikes and world rally championships. The proposal would operate seven days a week from 8.00 am to 6.00 pm, with potential for extended hours over weekends for special events. Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...