This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...Last updated: November 30, 2016
The Department of Minerals and Petroleum has referred a Programme of Work application. The application, from Holcim (Australia) Pty Ltd, is to undertake an air core drilling exploration programme on M70/1248 and M70/1250. The exploration site is cleared pine plantation to the East of Lake Jandabup. Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 27, 2016
The proposal area is approximately 33.4 hectares of Lot 4 Underwood Ave in Shenton Park. Within this area the University intends to establish a conservation area (13.9 hectares), Public Open Space (2 hectares) and a development area (17.5 hectares). The development area includes approximately 13 hectares to be developed for residential purposes with the remainder of the area for “University purposes - future use and development”, as it is affected by odour from the Subiaco Wastewater Treatment... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: September 12, 2016
The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway. It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections; three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: September 1, 2016
The Public Transport Authority of Western Australia proposes the Forrestfield-Airport Link, a 9km extension of the Perth rail network from Bayswater to Forrestfield. Read more...Last updated: August 10, 2016
This strategic proposal is to identify a development footprint for future industrial development over a 339 hectare area of the Rockingham Industrial Zone, while retaining an area as a conservation reserve. Read more...Last updated: July 18, 2016
Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking. Read more...Last updated: July 4, 2016
Urban Resources Pty Ltd proposes to develop a sand quarry on tenement M70/1262, located in Karnup approximately 48 kilometres (km) south of the Perth Central Business District. The proposal would extract 1.5 million cubic metres over a project life of around five years with a total disturbance footprint of around 42 hectares including the mining area, stockpiles, a haul road and site compound. The proponent has advised that the overall post-mining land use is expected to be consistent with the... Read more...Last updated: June 20, 2016
The Department of Defence proposes to undertake maintenance dredging of accumulated sediments alongside its marine infrastructure on the eastern side of Garden Island, in Cockburn Sound, to return naval waters to navigable depths. Approximately 1,900 cubic metres (m 3 ) of material is to be excavated from four locations in Careening Bay and 5,480m 3 of material from the Armaments Wharf in Sulphur Bay. The proposed dredging method is to use a long reach excavator with a bucket fitted with a... Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: February 15, 2016
Holcim (Australia) Pty Ltd proposes to develop a sand quarry on tenements M70/1248 and M70/1250, located in Jandabup north of Perth, approximately 8 km north east of Wanneroo and within the Local Government Area of Wanneroo. The site falls within the Gnangara Pine Plantation, which has been progressively harvested since 2003 until the current time. The site is in a cleared state from a recent harvest of pine. The project site is on the Gnangara Mound within the Gnangara Underground Water... Read more...Last updated: October 22, 2015
The Port Kennedy Regional Recreation Centre – Becher Point, Stage 1 proposal is for the creation of a major public recreation area and conservation park at Port Kennedy. Stage 1 of the proposal included a hotel, marina, holiday accommodation, two golf courses, and conservation areas. This inquiry under s46 is in regard to changing and consolidating the conditions of Ministerial Statements 105 and 359 . Read more...Last updated: May 20, 2015
The proposal is for the extension of an existing quarry at The Lakes, approximately 16 kilometres east of Mundaring and 47 kilometres south-west of Northam on the Great Southern Highway. The proponent has been operating the existing quarry since 1990. The quarry provides crushed granite for a variety of uses, including concrete, road base and building products. The current quarry comprises an open pit, a crushing plant, noise attenuation bunds, product stockpiles, a water supply dam, a workshop... Read more...Last updated: February 20, 2015
The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources. Read more...Last updated: February 18, 2015
Derived Proposal, : Lot 21 Alumina Road, East Rockingham identified in plan of subdivision titled Subdivision Concept Plan Lot 21 Alumina Road, East Rockingham dated 31 January 2014. Read more...