This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 14, 2024
Caravel Minerals Limited is seeking to develop the Caravel Copper Project, located in the Western Australian (WA) Wheatbelt approximately 150 km north of Perth. The Proposal will produce copper concentrate, which will be transported to port by road. The Proposal includes mine pits, waste rock landforms, tailings storage, ore processing and transfer infrastructure and associated infrastructure such as workshops, laydown areas, landfill, communications, offices, ablutions, wastewater treatment,... Read more...Last updated: May 22, 2023
The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: February 7, 2008
Proposal to carry out an onshore 3D seismic survey, 20 kilometres west of Brand Highway, northwest of Cataby in the Shire of Dandaragan, by Empire Oil Company (WA) Limited Read more...Last updated: December 9, 2002
Proposal by Mr John Fernie to clear approximately 570 hectares (ha) of native vegetation for pine and sandalwood plantation on Lot 7778 Wannamal South Road, Wannamal. Lot 7778 has a total area of 1,750 ha and is located approximately 12 kilometres northeast of Gingin, in the Shire of Gingin. Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: January 7, 2002
This proposal is to clear approximately 580 hectares (ha) of native vegetation on Melbourne Location 3544 within the Shire of Dandaragan for agriculture. Specifically, the stated purpose of the proposed clearing is to allow for grazing and a timber plantation. Read more...Last updated: January 2, 2002
The proponent, Mr R Klaassen, proposes to clear approximately 477 hectares of native vegetation on Victoria Location 10335, Shire of Dandaragan for agriculture and / or plantation forestry. Read more...Last updated: November 10, 2000
The proposal is to mine titanium minerals from Orebodies 27, 200 and 28000, adjacent to the southern mining operations of the existing Cooljarloo Mineral Sands mine, located 10 kilometres north-west of Cataby, Shire of Dandaragan. Read more...Last updated: March 13, 2000
Aurex Pty Ltd in joint venture with Mr KJ Fitzgerald, proposes to mine gypsum at Red Lake, 46 km north-east of Merredin within Mining Lease application M77/528 which is a vacant Crown land "window" within the Lake Campion "C" Class Nature Reserve 24789. Read more...Last updated: February 15, 1999
The Minister for Environment directed the EPA to reassess this proposal, previously Assessment no. 880 , pursuant to s43 of the EP Act. The proposal is to clear 870 hectares of native vegetation on Victoria Location 10598 Cockleshell Gully Road, Shire of Dandaragan to plant tagasaste. Victoria location 10598 comprises 1,705 hectares of which 500 hectares (30%) is currently cleared. It is proposed to retain 350 hectares (21%) of the property as native vegetation in accordance with the farm plan... Read more...Last updated: March 27, 1998
The proposal is for a 33 kilometre coastal road linking the town-sites of Cervantes and Jurien. Read more...Last updated: January 13, 1994
Rutherford Resources Pty Ltd proposes to develop a gold deposit in 'C' Class Nature Reserve No 18584 near Westonia, halfway between Southern Cross and Merredin in the eastern wheatbelt. The reserve has important conservation value due to the small area of land set aside for nature conservation in the wheatbelt. Mining is a potentially acceptable land use in 'C' Class Nature reserves under Government Policy if a proposal is considered to be environmentally acceptable. Read more...