Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (7) Apply Infrastructure filter
  • Power generation (3) Apply Power generation filter
  • Industrial (2) Apply Industrial filter
  • Oil and gas (1) Apply Oil and gas filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Flora and Vegetation (2) Apply Flora and Vegetation filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Air Quality (1) Apply Air Quality filter
  • Human Health (1) Apply Human Health filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • People (1) Apply People filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • (-) Remove State Energy Commission of Western Australia filter State Energy Commission of Western Australia

Filter by region:

  • South West (6) Apply South West filter
  • Perth (5) Apply Perth filter
  • Peel (2) Apply Peel filter
  • Great Southern (1) Apply Great Southern filter

Filter by last updated:

  • 1994 (2) Apply 1994 filter
  • 1992 (4) Apply 1992 filter
  • 1991 (2) Apply 1991 filter
  • 1990 (2) Apply 1990 filter
  • 1989 (1) Apply 1989 filter
  • 1988 (1) Apply 1988 filter
  1. Home
  2. Proposal search
  3. State Energy Commission of Western Australia
  4. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Proposed 132kv transmission line, Manjimup to Beenup Mineral Sands Mine

Last updated: March 23, 1994

In 1991, the State Energy Commission of Western Australia presented the Environmental Protection Authority with a number of alternatives for supplying power to the proposed Beenup mineral sands mine. These alternatives included on-site generation by the mining company, alternative technologies such as solar and wind power and a number of transmission line options. Read more...

Contamination Management Strategy for East Perth Gasworks Site and adjacent areas of the swan river

Last updated: March 8, 1994

The former Gasworks site at East Perth was used for the production of gas from coal between 1922 and 1971. Since decommissioning of the gas plant in 1971, structures have been progressively demolished. The site is now used as a services depot by the State Energy Commission of Western Australia, which is the owner of the site. As a result of past operations, extensive contamination by coal tars, including known carcinogenic and toxic organic chemicals, exists on the site and in adjacent areas of... Read more...

Wind farm near Nine Mile Beach, Esperance

Last updated: October 27, 1992

The proposal is to establish a 2,500 kilowatt wind farm and associated 33kV powerline near Esperance. The wind farm is to be built within 'C' class Flora Reserve Number 24486, near Nine Mile Beach approximately 8km west of Esperance. Read more...

Proposal for additional landscape works and extension of fly ash ponds - Turkey Point, Bunbury

Last updated: August 7, 1992

Additional landscape works and the extension of Fly-Ash Ponds at Turkey Point, Bunbury. Read more...

Harvey to Kwinana 330Kv Transmission Line - Proposed adjustment to alignment (s46) [710]

Last updated: June 25, 1992

The State Energy Commission have agreed to a request by the Department of Planning and Urban Development to change the proposed route of the Harvey - Kvvinana 330kV transmission line at Mandogalup (near Kwinana). The proposed realignment requires amendments to the environmental conditions of Ministerial Statement 41 , and this is the inquiry under s46 into the proposed amendments. Read more...

Beenup power supply

Last updated: March 12, 1992

The proposal is to construct and operate a 132 kilovolt (kV) transmission line between either the Picton or Manjimup substations and Mineral Deposits Limited proposed mineral sands mine at Beenup. SECWA's preferred option is for an overhead supply at 132kV from the Manjimup substation. Two other options from Picton (Great North Road and Margaret River) are also proposed. Read more...

Proposed Power Supply: Expansion of Pinjar Turbine Power Station

Last updated: August 21, 1991

SECWA proposes to expand the generating capacity of the approved Pinjar gas turbine power station site (eight 37MW units) by approximately 300 megawatts (MW). This represents a doubling in the power generating capacity of the power station. In SECWA's original proposal (approved under Ministerial Statement 61 ) the plant was proposed to be a peaking plant which can operate at times of high demand (1 to 8 hours per day) or in emergencies. In this expansion proposal the new gas turbines are... Read more...

Proposed Collie Power Station

Last updated: June 12, 1991

The proposal is to establish a second coal-fired base load power station 8km east-north-east of Collie. The proposal includes the construction of two 300 megawatt power generating units and associated infrastructure that will occupy 388 hectares of land. The proposed site is located on the edge of the Collie Coal Basin which is an area that contains the mineable coal reserves in the Collie region., The report:, An integral part of the environmental impact assessment process includes the need to... Read more...

Simulated natural gas plant, Mandurah

Last updated: September 10, 1990

The proposal is to provide reticulated gas to the public in the Mandurah area using standard air/gas mixing and storage facilities at SECWA's site in Gordon Road, Mandurah. The plant will provide an initial gas reticulation system to allow a customer base to be established. Further planning is to provide a connection to the Perth-Bunbury natural gas pipeline when the customer base is large enough to warrant the capital investment. The plant is similar to one operating in Albany... Read more...

Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station

Last updated: April 30, 1990

The proposal is to construct a power transmission line, with an associated corridor, between the existing Northern Terminal substation and a gas turbine power station at Pinjar which is presently under construction. Read more...

280 MW Gas Turbine Power Station at Pinjar

Last updated: March 14, 1989

The State Energy Commission is proposing to establish a gas turbine power station at Pinjar, north east of Wanneroo. At the completion of the construction in 1994, the station will comprise eight 35 MW gas turbine units. Read more...

Proposed Harvey to Kwinana 330Kv Transmission Line

Last updated: October 14, 1988

The proposal is for a 330 kV transmission line from Harvey to Kwinana, a distance of approximately 102 km. The first 51 km of the route parallels the existing Bunbury - Cannington 132 kV line from the Harvey Substation site almost to Pinjarra. There are a number of deviations to avoid major road intersections, dwellings and their environs and Pinjarra townsite. Following this , the route joins the existing Muja - Southern Terminal 330 kV line and follows it for most of the next 44 km. There is... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.