The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: June 13, 2022
Marine Produce Australia propose to expand its barramundi farm operations to 13 sites spread across the Buccaneer Archipelago, in the Kimberley region. The total development envelope for the 13 leases is 1213 hectares. The proposed expansion will be staged over a 10-year period. Each stage consists of the construction of one nursery site, supplying 4–5 ocean-based lease areas, each of which will contain 12 sea-cages. The maximum standing biomass per lease area is up to 4500 tonnes. The total... Read more...Last updated: May 31, 2022
Gascoyne Gateway Ltd proposes to construct and operate a multi-use single jetty and associated shore-based activities approximately 10 kilometres south of Exmouth on the western and eastern sides of Minilya-Exmouth Road. The development envelope is approximately 3.8 km 2 in size and includes a single access jetty, onshore strategic port land, renewables precinct, desalination infrastructure and fuel storage. Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: May 2, 2022
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...Last updated: February 28, 2022
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Iron Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: December 21, 2021
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: November 30, 2021
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: November 24, 2021
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: October 25, 2021
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: October 21, 2021
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 80,000 cubic metres from the entrance channel of the port and seabed levelling of 10,000 cubic metres in the berth pocket to restore navigable depths. The development envelopes... Read more...Last updated: September 28, 2021
Busselton Jetty Incorporated is proposing to construct and operate an underwater observatory, the Australian Underwater Discovery Centre (AUDC) at the existing Busselton Jetty, Busselton, south-west Australia. The proposal includes the towing of the pre-fabricated AUDC by vessel approximately 100 nautical miles, underwater debris removal, piling activities, installation of the AUDC and installation of a pre-fabricated modular building on the jetty. Piling works associated with the installation... Read more...Last updated: September 20, 2021
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: September 6, 2021
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: August 9, 2021
Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: October 15, 2020
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...