This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: March 18, 2013
The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...Last updated: January 4, 2013
Kemerton Silica Sand Mining Proposal, additional mining areas and transfer of land for conservation - section 46 request for change to implementation conditions of Ministerial Statement 703 . Read more...Last updated: November 1, 2012
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 10, 2011
The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: January 22, 2010
The Shire of Busselton proposes to build a road, known as Ford Road, across the Vasse Estuary. The road is currently an unsealed road (track). The Environmental Protection Authority (EPA) has previously reported on the environmental acceptability of constructing the road ( EPA Bulletin 940 ). In Bulletin 940, the EPA recommended that the proposal not be implemented as the proposal would not meet the EPA's objective in relation to waterbirds. The Shire of Busselton, as proponent, appealed... Read more...Last updated: November 2, 2009
Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...Last updated: October 31, 2006
The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...