Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (15) Apply Iron Ore filter
  • Industrial (3) Apply Industrial filter
  • Land use (3) Apply Land use filter
  • Oil and gas (1) Apply Oil and gas filter
  • Power generation (1) Apply Power generation filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (71) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (5) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (3) Apply Minister determined that the proposal should not be implemented filter
  • Awaiting Ministerial decision (2) Apply Awaiting Ministerial decision filter
  • EPA Report and Recommendations released - appeals closed (2) Apply EPA Report and Recommendations released - appeals closed filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by preliminary environmental factors:

  • (-) Remove Inland Waters Environmental Quality filter Inland Waters Environmental Quality
  • Flora and Vegetation (68) Apply Flora and Vegetation filter
  • Hydrological Processes (65) Apply Hydrological Processes filter
  • Terrestrial Fauna (52) Apply Terrestrial Fauna filter
  • Social Surroundings (41) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (30) Apply Terrestrial Environmental Quality filter
  • Air Quality (21) Apply Air Quality filter
  • Marine Environmental Quality (11) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (9) Apply Benthic Communities and Habitats filter
  • Subterranean Fauna (8) Apply Subterranean Fauna filter
  • Marine Fauna (7) Apply Marine Fauna filter
  • Coastal Processes (5) Apply Coastal Processes filter
  • People (4) Apply People filter
  • Landforms (3) Apply Landforms filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • Water Corporation (10) Apply Water Corporation filter
  • Main Roads Western Australia (8) Apply Main Roads Western Australia filter
  • Fortescue Metals Group Limited (5) Apply Fortescue Metals Group Limited filter
  • Main Roads WA (4) Apply Main Roads WA filter
  • API Management Pty Limited (3) Apply API Management Pty Limited filter
  • Grange Resources Limited (2) Apply Grange Resources Limited filter
  • Main Roads of Western Australia (2) Apply Main Roads of Western Australia filter
  • Oakajee Port and Rail Pty Ltd (2) Apply Oakajee Port and Rail Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Broome International Airport Holdings (1) Apply Broome International Airport Holdings filter
  • Bunbury Port Authority (1) Apply Bunbury Port Authority filter
  • City of Armadale (1) Apply City of Armadale filter
  • City of Busselton (1) Apply City of Busselton filter
  • City of Cockburn (1) Apply City of Cockburn filter
  • Commissioner of Railways (1) Apply Commissioner of Railways filter
  • Coolimba Power Pty Ltd (1) Apply Coolimba Power Pty Ltd filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd filter
  • Department of Treasury - Strategic Projects (1) Apply Department of Treasury - Strategic Projects filter
  • Ferro Metals Australia Pty Ltd (1) Apply Ferro Metals Australia Pty Ltd filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Hamersley HMS Pty Ltd (1) Apply Hamersley HMS Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • LandCorp and Octennial Holdings Pty Ltd (1) Apply LandCorp and Octennial Holdings Pty Ltd filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Main Roads (1) Apply Main Roads filter
  • Main Roads Western Australia and Ellenbrook Management Pty Ltd (1) Apply Main Roads Western Australia and Ellenbrook Management Pty Ltd filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Metropolitan Cemeteries Board (1) Apply Metropolitan Cemeteries Board filter
  • Mr Adrian Brajkovich (1) Apply Mr Adrian Brajkovich filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Rottnest Island Authority (1) Apply Rottnest Island Authority filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Shire of Busselton (1) Apply Shire of Busselton filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • The Minister for State Development (1) Apply The Minister for State Development filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Western Australian Planning Commission (1) Apply Western Australian Planning Commission filter
  • Western Australian Planning Commission; City of Belmont (1) Apply Western Australian Planning Commission; City of Belmont filter

Filter by region:

  • Perth (36) Apply Perth filter
  • Pilbara (24) Apply Pilbara filter
  • South West (12) Apply South West filter
  • Mid West (3) Apply Mid West filter
  • Peel (3) Apply Peel filter
  • Wheatbelt (3) Apply Wheatbelt filter
  • Great Southern (2) Apply Great Southern filter
  • Kimberley (2) Apply Kimberley filter
  • Gascoyne (1) Apply Gascoyne filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter

Filter by last updated:

  • 2022 (3) Apply 2022 filter
  • 2020 (5) Apply 2020 filter
  • 2019 (6) Apply 2019 filter
  • 2018 (6) Apply 2018 filter
  • 2017 (3) Apply 2017 filter
  • 2016 (8) Apply 2016 filter
  • 2015 (2) Apply 2015 filter
  • 2014 (5) Apply 2014 filter
  • 2013 (4) Apply 2013 filter
  • 2012 (4) Apply 2012 filter
  • 2011 (8) Apply 2011 filter
  • 2010 (3) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2007 (1) Apply 2007 filter
  • 2006 (1) Apply 2006 filter
  • 2005 (3) Apply 2005 filter
  • 2004 (1) Apply 2004 filter
  • 2002 (5) Apply 2002 filter
  • 2001 (1) Apply 2001 filter
  • 2000 (2) Apply 2000 filter
  • 1999 (3) Apply 1999 filter
  • 1997 (2) Apply 1997 filter
  • 1996 (3) Apply 1996 filter
  • 1995 (2) Apply 1995 filter
  • 1994 (1) Apply 1994 filter
  • 1991 (1) Apply 1991 filter
  • 1989 (2) Apply 1989 filter
  1. Home
  2. Proposal search
  3. Inland Waters Environmental Quality
  4. Infrastructure

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

New Perth Stadium Project

Last updated: January 11, 2013

The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...

Rottnest Island Golf Course Upgrade

Last updated: December 24, 2012

The Environmental Protection Authority (EPA) has received a referral from the Rottnest Island Authority (RIA) to revitalise the island’s 22 hectare public golf course, west of the Thomson Bay settlement. Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Cape Lambert Port upgrade - increase in throughput to 85 Mtpa

Last updated: April 4, 2012

The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...

Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites (Stage B)

Last updated: March 28, 2012

The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal

Last updated: November 22, 2011

The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...

Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion

Last updated: August 5, 2011

The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...

Christmas Creek Water Management Scheme

Last updated: August 1, 2011

The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...

Oakajee Rail Development

Last updated: March 14, 2011

Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...

Oakajee Terrestrial Port Development

Last updated: March 14, 2011

The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...

Mungada Iron Ore Project

Last updated: March 11, 2011

The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...

South West Yarragadee Water Supply Development

Last updated: March 10, 2011

The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV

Last updated: January 20, 2011

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...

Southern Source Integration Assets Pipeline Corridor

Last updated: November 4, 2010

Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...

Coolimba Power Station Project, Eneabba

Last updated: September 17, 2010

The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...

Proposal to construct a road across Vasse Estuary, Ford Road, Shire of Busselton

Last updated: January 22, 2010

The Shire of Busselton proposes to build a road, known as Ford Road, across the Vasse Estuary. The road is currently an unsealed road (track). The Environmental Protection Authority (EPA) has previously reported on the environmental acceptability of constructing the road ( EPA Bulletin 940 ). In Bulletin 940, the EPA recommended that the proposal not be implemented as the proposal would not meet the EPA's objective in relation to waterbirds. The Shire of Busselton, as proponent, appealed... Read more...

Balla Balla Magnetite Project

Last updated: April 28, 2009

The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...

Perth – Bunbury Highway (Peel Deviation)

Last updated: September 24, 2007

The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...

Abernethy Road – Tonkin Highway On-ramp

Last updated: January 25, 2006

Main Roads Western Australia (MRWA), propose to construct an On-ramp from Abernethy Road to Tonkin Highway, Kewdale. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations as required by Section 44 of the, Environmental Protection Act 1986, to the Minister for the Environment, on the environmental factors relevant to the proposal. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.