This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 1, 2021
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: February 1, 2021
Peet Stratton Pty Ltd propose to develop the Lot 102 for urban uses as part of the wider Movida residential development. The proposal area is 8.6 hectares (ha) of which approximately 6ha is proposed for development. 2.65ha of native vegetation is proposed to be retained for conservation purposes. Read more...Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: January 22, 2021
Changes to condition 11 Offsets following a change to proposal after assessment Read more...Last updated: January 22, 2021
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...