This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: September 16, 2020
This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...Last updated: September 14, 2020
Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...Last updated: September 10, 2020
The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...Last updated: September 4, 2020
A proposed rare earth elements (REE) mine and ore processing facility at Browns Range, approximately 160 kilometres (km) southeast of Halls Creek in the Shire of Halls Creek. Read more...Last updated: September 4, 2020
Energy Resources Limited proposes to undertake a 2D onshore seismic acquisition survey to map the subsurface geology of the area, within petroleum exploration permit 432 in the Shire of Dandaragan. The proposal comprises a total of 125 line kilometres of 2D seismic lines within an area of about 122.6 km2. The proposal will require temporary disturbance of up to 40 hectares of native vegetation to create access lanes for the vibroseis trucks and light vehicles. The proposal is to be undertaken... Read more...Last updated: August 31, 2020
The West Bay Barge Landing has been in operation since 1944 and is located approximately 7 km east of the Mungalalu Truscott Airbase, in the Kimberley Region. The site is approximately 520 km west southwest of Darwin and 617 km northeast of Broome and is located on the Anjo Peninsula on the northern tip of Western Australia. The proponent, Mungalalu Truscott Airbase Pty Ltd, is proposing to dredge 22,000m 3 of the barge landing to restore safe navigable depths. Disposal of dredged material is... Read more...Last updated: August 24, 2020
King Street Trust is applying for Planning Consent and an Extractive Industries Licence for sand extraction on Lot 226, Paterson Road, Nambeelup, for a period of 10 years. Lot 226 Paterson Road is approximately 155 hectares (ha) in size. The proposal will require a total of 24.5 ha of proposed disturbance (excavation) including 12.7 ha of native vegetation clearing. The depth of excavation will be between 1 to 5 metres below natural land surface, with the rate of excavation between 50 000 and... Read more...Last updated: August 12, 2020
The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...Last updated: August 10, 2020
The proposal is to construct and operate a multi-use motorsport complex on Lot 78 Punrak Road Keysbrook, and to redirect stormwater to Lot 400 Wigg Road Keysbrook. The proposal would be used for road safety driver training, amateur car events, a go-kart track, V8 supercar events, motorbikes and world rally championships. The proposal would operate seven days a week from 8.00 am to 6.00 pm, with potential for extended hours over weekends for special events. Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...Last updated: August 6, 2020
Change to Extension of Timeframe for substantial commencement. Read more...Last updated: July 27, 2020
MRWA is proposing to construct and operate Stage 2 (the Southern Link) and 3b (part of the Western Link) portion of the Albany Ring Road Proposal (ARR). The proposal includes construction and operation of seven kilometres of new road which will connect the intersection of South Coastal Highway and Link Road to the Port of Albany around the City of Albany. Stage 2 of the ARR is the southern link of the ring road located between the Lower Denmark Road George Street Intersection and Frenchman... Read more...Last updated: July 24, 2020
Kimberley Marine Support Base Pty Ltd (KMSB) are proposing to develop the Kimberley Marine Offloading Facility at the Port of Broome, approximately 200 metres south of the existing Broome Wharf. The proposal includes construction and operation of a deep-water floating wharf, along with associated onshore hardstand and terminal facilities suitable for container and general cargo stevedoring for coastal trading vessels, berthing and mooring for Cruise vessels and Roll on/Roll off ships.... Read more...Last updated: July 23, 2020
Change to condition 1 commitment 39 of Ministerial Statement 308 in order to consider the change of distance to the nearest sensitive receptor. Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: July 23, 2020
Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...Last updated: July 21, 2020
Changes to Environmental Commitment 2.2.1 related to condition 1 and condition 3, in order to change the authorised storage capacity of chlorine at the proposed site. Read more...Last updated: July 21, 2020
ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...Last updated: July 13, 2020
The Commonwealth Department of Defence proposes to establish two underwater training ranges (UTR) to facilitate ongoing training of Defence personnel in underwater demolition operations. The key activity during training is the detonation of small volumes (up to 5 kilograms) of explosives. The location of the two proposed UTRs are in Western Australian State waters, currently used as military training exercise areas. One proposed UTR is adjacent to Campbell Barracks, approximately 10km west of... Read more...