This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 2, 2020
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: November 4, 2020
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: October 15, 2020
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: October 12, 2020
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: October 5, 2020
The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...Last updated: September 30, 2020
Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...Last updated: September 29, 2020
Meynell Pty Ltd intends to subdivide Lot 9002 Prowse Road, Capel to create 70 lots for residential development, associated access roads and a reserve for recreation and drainage. The proposal area is 15.5 hectares (ha) of which approximately 11.5 ha is proposed for development. Read more...Last updated: September 29, 2020
Lot 123 Mortimer Road Casuarina (Lot 123) is 45 hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lot of 7.9 hectares (ha) and a balance lot for residential development. Lot 123 contains excellent quality remnant Banksia woodland vegetation, threatened fauna habitat, and a conservation category wetland. Read more...Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: September 14, 2020
Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...Last updated: September 4, 2020
A proposed rare earth elements (REE) mine and ore processing facility at Browns Range, approximately 160 kilometres (km) southeast of Halls Creek in the Shire of Halls Creek. Read more...Last updated: September 4, 2020
Energy Resources Limited proposes to undertake a 2D onshore seismic acquisition survey to map the subsurface geology of the area, within petroleum exploration permit 432 in the Shire of Dandaragan. The proposal comprises a total of 125 line kilometres of 2D seismic lines within an area of about 122.6 km2. The proposal will require temporary disturbance of up to 40 hectares of native vegetation to create access lanes for the vibroseis trucks and light vehicles. The proposal is to be undertaken... Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...Last updated: July 24, 2020
Kimberley Marine Support Base Pty Ltd (KMSB) are proposing to develop the Kimberley Marine Offloading Facility at the Port of Broome, approximately 200 metres south of the existing Broome Wharf. The proposal includes construction and operation of a deep-water floating wharf, along with associated onshore hardstand and terminal facilities suitable for container and general cargo stevedoring for coastal trading vessels, berthing and mooring for Cruise vessels and Roll on/Roll off ships.... Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: July 23, 2020
Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...Last updated: July 21, 2020
ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...