Last updated: June 28, 1996
The proposal is to improve Albany Port's facility for the mooring of existing port service vessels and for a new large tug. The proposal involves: dredging of approximately 25,000 cubic metres (m 3 ) (1.6 hectares) of material to provide a maximum water depth of -6m CD (Chart Datum); reclamation of 0.4 hectares of PRH using dredge spoil; establishment of a coarse sand beach fronting the reclamation area; construction of a rubble mound breakwater, approximately 250 metres long, using... Read more...Last updated: June 25, 1996
The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...