This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 15, 1987
The proposal is to change mining methods of the Eneabba south operation from dry mining to dredging. This would involve the establishment of a dredge pond in existing mining pits from which a suction cutter dredge would progress along a prescribed mining path followed by a floating wet concentrator plant. Tailings would be stacked behind the operations allowing rehabilitation of mined out areas to be carried out progressively as the dredge operation proceeds. Rehabilitation would involve re-... Read more...Last updated: September 1, 1987
The proposal is for a brick and tile plant at Malaga, approximately 12 km north-north-east of Perth, to produce 50 million bricks per year. The site is surrounded to the south and east by industrial, or proposed industrial, land. To the north is the proposed extension to the Ballajura residential estate and to the west a Parks and Recreation Reserve which backs on to the Koondoola residential area. The distance from the plant to the closest residential area would be over 600 metres. Read more...Last updated: September 1, 1987
The proposal is to establish a brickworks on the Midland abattoir site. Stage 1 of the project is to supply 50 million bricks a year to the local brick market. For the later Stage 2 of the project it is proposed to expand this plant to 100 million bricks a year. Read more...