This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 27, 2022
Proposal to build and operate a Regional Resource Recovery Center on Pt Lot 78 and Pt Lot 85 Bannister Rd, Canning Vale. Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: September 24, 2020
Change to implementation conditions relating to financial assurance requirements. Read more...Last updated: September 10, 2020
The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...Last updated: January 20, 2020
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: October 1, 2019
The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...Last updated: February 5, 2019
The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north... Read more...Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: December 8, 2017
The Class II Landfill, Lot 7778 Diagram 209805, 1189 Wannamal Road South proposal is to construct and operate a landfill accepting Class II-type waste in Gingin, Western Australia. The proposal includes a landfill gas collection and utilisation plant. The EPA notes that Lot 7778 Diagram 209805 has been subdivided and the proposal is now located on Lot 98 on Deposited Plan 75926, Wannamal Road South. Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: February 20, 2015
The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...Last updated: July 9, 2014
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: July 2, 2014
To construct and operate a landfill accepting Class II-type waste. Six cells will be constructed with a total operational lifetime of not more than 30 years. A landfill gas collection system and utilisation plant facility will also be constructed. Inquiry under s46 to change condition 3 - extension of Time Limit of Authorisation - Ministerial Statement 796 . Read more...Last updated: June 11, 2009