PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: July 13, 2020
Peet Stratton Pty Ltd propose to develop the Lot 102 for urban uses as part of the wider Movida residential development. The proposal area is 8.6 hectares (ha) of which approximately 6ha is proposed for development. 2.65ha of native vegetation is proposed to be retained for conservation purposes. Read more...Last updated: January 20, 2020
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: February 6, 2017
The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale. Read more...Last updated: January 9, 2017
Lost Sands Pty Ltd (Lost Sands) proposes to develop and operate the Cyclone Mineral Sands Project, located on the northern margin of the Eucla Basin, approximately 317 kilometres (km) north of Eucla and 220 km north of the Trans-Australia Railway. The proposal is for a mining operation to produce zircon and two high titanium mineral products. The conceptual layout of the mine includes open cut pits, mining and processing infrastructure, airstrip, camp and bore fields. The proposal is located in... Read more...Last updated: December 7, 2016
Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion. The extent of proposed ground disturbance is approximately: 11,322 hectares for the mine expansion within a development... Read more...Last updated: November 21, 2016
Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. Read more...Last updated: January 12, 2015
The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted this proposal back to the EPA for assessment at the level of Public Environmental Review (8 weeks). Access the re-assessment of this proposal here. Read more...Last updated: March 10, 2011
The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...Last updated: March 1, 1988
The proposal is for a silicon smelter at Picton, near Bunbury. On 31 March 1988, subsequent to the release of the EPA's report and recommendations relating to this assessment, the Deputy Premier referred to the EPA a proposal for the possible relocation of the project to the Kemerton Industrial Area . Read more...