This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 5, 2023
Change to condition 3 to extend the time limit for proposal implementation Read more...Last updated: October 28, 2021
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: February 1, 2021
Change relates to requirements of condition 7 -1(1) and 7-1(3), and includes an update of Figure 4 and change to Schedule 2 to amend the spatial dataset to reflect the removal of Malleefowl Mound Exclusion Zone for MM23 referred to in condition 7-1(1) Amend conditions 8-1(4) and 8-8(2) to replace the reference to 6,957 individuals of Microcorys sp. Mt Holland (D.Angus DA2397) to 15.93 per cent of the regional population. This proposal was assessed in conjunction with assessment 2279. EPA Report... Read more...Last updated: November 18, 2019
Changes to Condition 3 of Ministerial Statement 953 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: September 18, 2019
Inquire into and report on the matter of changing implementation condition 5-1: Air Quality in Ministerial Statement 870 for the above proposal to protect rock art. Read more...Last updated: April 3, 2017
The proponent for the proposal, Western Australian Sports Centre Trust (trading as Venues West), has requested changes to the implementation conditions 6-1 and 6- of Ministerial Statement 632 relating to Water Quality. This is the EPA's inquiry into the requested amendments. Read more...Last updated: June 30, 2016
The proposal is for the operation of a gold concentrate processing plant and associated infrastructure at Gidji approximately 17 km north of the City of Kalgoorlie-Boulder. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 28 and Ministerial Statement 77 . Read more...Last updated: February 26, 2015
The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...Last updated: January 14, 2002
The Western Australia Police Service has applied to the Minister for the Environment under regulation 17 of the Environmental Protection (Noise) Regulations 1997 to allow the emission of noise from the WA Police Academy, Joondalup to exceed the prescribed standard for noise emissions as specified in noise regulation 7. Read more...Last updated: October 2, 1987
The proposal is to mine alluvial diamonds in the Bow River area of Western Australia. The proposal involves the establishment of a plant to process riverine gravel. The fine waste material will be disposed of in a tailing dam and the coarse waste material dumped near the processing plant. The diamondiferous material will be concentrated in a Heavy Medium Separater and then sorted using an x-ray diamond sorter. The plant will process 4,000 tonnes per day. The orebody covers approximately 500 ha... Read more...