This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 23, 2008
The proposal is for the subdivision of Lot 48 Furnissdale Road, Furnissdale. Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: December 4, 2008
The construction and operation of a tourism development on Long Island, Wallabi Group, Houtman-Abrolhos Islands, consisting of visitor lodges (maximum of 60 guests), staff accommodation, communal facilities (including day-visitor facilities), boardwalks and gazebos, a swimming pool, deep water jetty, helipad, wastewater treatment plant, desalination plant and other maintenance/service facilities Read more...Last updated: August 12, 2008
Inquiry under s46 into changing the conditions (time extension) of Ministerial Statement 469 , relating to the construction of a deepwater port at either the “north”, “central” or “south” location. Read more...Last updated: August 5, 2008
To develop an open pit mine and process 20 million tonnes per annum (Mtpa) of ore to produce approximately 23,000 tonnes per annum (tpa) of molybdenum concentrate and approximately 48,000 tpa of copper concentrate. Read more...Last updated: June 12, 2008
Proposal by Hamersley Iron Pty Limited (the proponent) to increase the throughput of iron ore at its Dampier Port operations from 120 million tonnes per annum (Mtpa) to 145Mtpa. Read more...Last updated: May 7, 2008
Mr H J Hawke proposes to subdivide Lot 2 Ellenbrook Road, Bullsbrook, into 8 lots of approximately 2 hectares (ha) each and a service road, for rural residential purposes. The land, which is located within the Environmental Protection (Western Swamp Tortoise) Policy area, covers an area of approximately 17.15 ha and is adjacent to the Ellen Brook. A Conservation Category Wetland (CCW)s and Bush Forever Site 296 extend along and into the eastern boundary of the property. Read more...Last updated: March 20, 2008
The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...Last updated: March 13, 2008
The proposal is for the clearing of an area of native vegetation not exceeding 6.5 hectares; the construction of a lease pad (drilling area), access track and camp site; extraction of material from a Reserve Borrow Pit; drilling of petroleum exploration well Freshwater Point 1; and rehabilitation. Read more...Last updated: February 25, 2008
The implementation of a one-year, pilot scale yellowfin tuna seacage aquaculture trial in the Zeewijk Channel, Abrolhos Islands (approximately 75 kilometres west of Geraldton). Read more...Last updated: February 7, 2008
Proposal to carry out an onshore 3D seismic survey, 20 kilometres west of Brand Highway, northwest of Cataby in the Shire of Dandaragan, by Empire Oil Company (WA) Limited Read more...Last updated: January 21, 2008
Proposal by West Australian Landfill Services Pty Ltd (WALS) to modify the footprint of the South Cardup landfill. Read more...Last updated: January 8, 2008
This assessment relates to the application by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) for an Approval pursuant to noise regulation 17 for its proposed Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning. The Approval will enable KCGM to vary its noise levels from the prescribed standard in the noise regulations. Following the release of the EPA’s initial advice and recommendations to the Minister for the Environment, Bulletin 1271, the Minister for the... Read more...