This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 29, 2023
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...Last updated: September 27, 2023
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. Read more...Last updated: September 26, 2023
Inquire into condition 10 of Ministerial Statement 892 to remove the requirement to constitute the Parker Range Conservation Trust and contemporise the offset requirements for mitigating residual impacts. Read more...Last updated: September 18, 2023
The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: August 15, 2023
Inquire into and report on the matter of changing condition 12 of Ministerial Statement 757 to align it with contemporary greenhouse gas conditions reflecting the content of the Pluto LNG Facility Greenhouse Gas Abatement Program. Read more...Last updated: August 15, 2023
Change to condition 1 commitment 1, updating the commitment to be in line with requirements under the Aboriginal Heritage Act 1972 and the Heritage Agreement in place between AGID and the local Traditional Owners (Buurabalayji Thalanyji Aboriginal Corporation (BTAC)). Read more...Last updated: August 14, 2023
Horizon Power is proposing to construct common user transmission infrastructure to enable the supply of grid electricity to the Burrup Strategic Industrial Area (SIA). The Proposal includes construction of an approximately 7 km long, 132 kV overhead transmission line between the Dampier substation and the Burrup SIA, clearing of unsealed access tracks along the transmission line route, an extension of the existing Dampier substation (inclusive of 132 kV switchgear, fencing and ancillary... Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is an expansion of the existing Roy Hill Port and will comprise the construction and operation of port infrastructure including, but not limited to, a stockyard, rail loop, train unloader, conveyors, wharf and ship[1]loading facility at Port Hedland. The proposal is a consolidation of the Roy Hill 1 Iron Ore Project, Port Infrastructure and the Multi-User Iron Ore Export (Landside) Facility approved proposals. Ministerial Statements 858, 978 and 1084 for the existing Roy Hill 1... Read more...Last updated: July 24, 2023
The Eastern Metropolitan Regional Council is proposing to construct and operate an immobilisation plant to treat Class V Air Pollution Control Residue (APCr) generated from offsite Waste to Energy plants, and to construct a dedicated Class IV monocell for disposal of the treated APCr, at the Red Hill Waste Management Facility, located within the City of Swan. The immobilisation plant will treat APCr to meet Class IV standards suitable for disposal into Class IV landfills. The existing Class IV... Read more...Last updated: July 16, 2023
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...