This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 28, 2024
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: March 26, 2024
The proposal is to increase the hours of operation of the existing Kemerton Power Station from 2,000 hours/annum to 13,800 hours/annum. The proposal does not involve any clearing, construction, commissioning or development of new equipment or infrastructure. Read more...Last updated: November 27, 2023
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: September 6, 2022
Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...Last updated: November 1, 2021
The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass. Sediment removal will be staged and undertaken via a mobile micro-dredge, or similar unit. The dredged sediment will be pumped to a designated onshore laydown area(s), allowed to dewater with the return water... Read more...Last updated: October 25, 2021
Renergi Pty Ltd propose to build and operate a trial pyrolysis plant in the Shire of Collie. The rial will run for up to 2 years. The proposal involves the treatment of municipal waste and forestry waste via pyrolysis to produce a biochar, condensed bio-oil and wood vinegar. The trial plant is small scale and will be constructed within the boundary of the Collie waste facility operated by the Shire of Collie Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: September 21, 2020
Kelliher Bros. propose to install a 40 ha single pivot irrigation system in Meelon, Western Australia (Shire of Murray). The site is located approximately 20 km south-east of Mandurah and 5 km south east of Pinjarra, and is zoned "rural" under the Local Planning Scheme. The project site is owned by Kelliher Bros and covers an area of approximately 178 ha. It is bounded by McLarty Rd to the west, Tuckey Road to the east, Pinjarra-Williams Road to the north and other rural lots to... Read more...Last updated: September 10, 2020
The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...Last updated: August 24, 2020
King Street Trust is applying for Planning Consent and an Extractive Industries Licence for sand extraction on Lot 226, Paterson Road, Nambeelup, for a period of 10 years. Lot 226 Paterson Road is approximately 155 hectares (ha) in size. The proposal will require a total of 24.5 ha of proposed disturbance (excavation) including 12.7 ha of native vegetation clearing. The depth of excavation will be between 1 to 5 metres below natural land surface, with the rate of excavation between 50 000 and... Read more...Last updated: April 15, 2019
The proponent, Kelliher Bros. plan to expand their grass-fed beef production business from 6 weeks a year to year-round grazing. To achieve this, the proponent would like to trial the installation of a single 40 ha centre pivot irrigator for irrigating pasture within an area of Lot 209 Paterson Road, Ravenswood (88 ha). The proposal occurs within the, Environmental Protection Peel Inlet - Harvey Estuary Policy 1992, policy area. Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: September 21, 2018
This is the inquiry into a request for changes to Ministerial Statement 906 , relating to the Point Grey Marina. Read more...Last updated: December 18, 2017
The Wagerup Alumina Refinery revised proposal is to construct and operate the Wagerup Alumina Refinery to a maximum production capacity of 4.7 million tonnes per annum (Mtpa) and its associated bauxite mining. The proponent for the proposal, Alcoa of Australia (Alcoa), requested an extension of the Time Limit of Authorisation for substantial commencement (now referred to as the Time Limit of Proposal Implementation) to be extended by five years to 14 September 2021 as the third production unit... Read more...Last updated: December 7, 2016
The Florida Partnership is proposing to subdivide and construct the portion of Florida Beach Estate known as ‘Florida North’, which will create approximately 161 lots for residential development. The site is zoned for this purpose in the Peel Region Scheme and the City of Mandurah Town Planning Scheme. The proposed development footprint is approximately 16.73 hectares (ha) and will require clearing approximately 11.72 ha of native vegetation. Read more...Last updated: December 7, 2016
The Shire of Murray proposes to construct an approximate 650 metre section of Fiegert Road, Barragup in the vincinity of the Nambeelup Brook. In considering this proposal the EPA notes that an informal (4 wheel drive accessible) track is already in place within the existing road reserve, and infrastructure in the form of a bridge is in place over the Nambeelup Brook. Read more...Last updated: November 14, 2016
The Port Rockingham Marina proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound. The EPA assessed the proposal at the level of Public Environmental Review and released its assessment report (Report 1339) in September 2009. Read more...