Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Gold filter Gold

Filter by current status:

  • Ministerial Statement published (17) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (6) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter

Filter by relevant environmental factors:

  • Flora and Vegetation (8) Apply Flora and Vegetation filter
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Air Quality (4) Apply Air Quality filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Landforms (3) Apply Landforms filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • Greenhouse Gas Emissions (1) Apply Greenhouse Gas Emissions filter
  • Human Health (1) Apply Human Health filter
  • Inland Waters (1) Apply Inland Waters filter
  • Land (1) Apply Land filter
  • People (1) Apply People filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Kalgoorlie Consolidated Gold Mines Pty Ltd (7) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Bellevue Gold Limited (2) Apply Bellevue Gold Limited filter
  • Goldfan Limited (2) Apply Goldfan Limited filter
  • Anglo American Pacific Limited (1) Apply Anglo American Pacific Limited filter
  • Gold Road Resources Limited (1) Apply Gold Road Resources Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) filter
  • KCGM (1) Apply KCGM filter
  • Marda Operations Pty Ltd (1) Apply Marda Operations Pty Ltd filter
  • North Kalgurli Mining Limited (1) Apply North Kalgurli Mining Limited filter
  • Peko Gold Ltd (1) Apply Peko Gold Ltd filter
  • Placer (Granny Smith) Pty Limited (1) Apply Placer (Granny Smith) Pty Limited filter
  • Poseidon Gold Ltd (1) Apply Poseidon Gold Ltd filter
  • Red October Gold Pty Ltd (1) Apply Red October Gold Pty Ltd filter
  • Southern Cross Goldfields Limited (1) Apply Southern Cross Goldfields Limited filter
  • St Ives Gold Mining Company Pty Limited (1) Apply St Ives Gold Mining Company Pty Limited filter
  • St Ives Gold Mining Company Pty Ltd (1) Apply St Ives Gold Mining Company Pty Ltd filter
  • Tectonic Resources NL (1) Apply Tectonic Resources NL filter
  • WMC Resources Ltd (St Ives Gold) (1) Apply WMC Resources Ltd (St Ives Gold) filter

Filter by region:

  • (-) Remove Goldfields Esperance filter Goldfields Esperance

Filter by last updated:

  • 2022 (3) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2018 (1) Apply 2018 filter
  • 2016 (4) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (1) Apply 2013 filter
  • 2009 (1) Apply 2009 filter
  • 2008 (1) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  • 2006 (2) Apply 2006 filter
  • 2000 (2) Apply 2000 filter
  • 1999 (1) Apply 1999 filter
  • 1993 (2) Apply 1993 filter
  • 1992 (1) Apply 1992 filter
  • 1989 (2) Apply 1989 filter
  • 1988 (2) Apply 1988 filter
  1. Home
  2. Proposal search
  3. Goldfields Esperance
  4. Gold

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project

Last updated: December 19, 2022

Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), located 600 kilometres East of Perth, and adjacent to the City of Kalgoorlie-Boulder, Western Australia. The proposal is a significant amendment to the current Fimiston Gold Mine Operations Extension (Stage 2) and Mine Closure Planning, approved under Ministerial Statement 782, operated by Kalgoorlie Consolidated Gold Mines (KCGM). The proposal is for the expansion of the Fimiston operations in... Read more...

Die Hardy Project

Last updated: June 27, 2022

Marda Operations Pty Ltd propose to develop a gold mining project, approximately 140 kilometres north of the town of Southern Cross within the Shire of Yilgarn. The proposal will include mining below the groundwater table by conventional open cut methods and ore will be transported offsite for processing. The proposal also includes a waste rock landform, mine ore pad, topsoil and low grade stockpiles and supporting infrastructure. The proposal is adjacent to the proposed Die Hardy Range... Read more...

Recommencement of Operations at the Bellevue Gold Project

Last updated: May 30, 2022

The Bellevue Gold Project is a historic gold mining operation located approximately 40 kilometres north of Leinster in the Northern Goldfields region. The proposal is for the recommencement of operations at the Bellevue Gold Project and involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite processing and waste disposal. The proposal requires a disturbance of 363.2 hectares (ha) within a development envelope of 1,030 ha. The proposed life of... Read more...

Bellevue Gold Project - Underground Dewatering

Last updated: November 8, 2021

The proposal is for the dewatering of up to 1 gigalitre per annum from the existing underground component of the Bellevue Gold Mine, to allow safe access for exploration drilling. This will occur on mining leases M36/24 and M36/25, 40km NW of Leinster. Read more...

Gruyere Gold Project

Last updated: April 18, 2018

Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...

Gold Mine Developments on Lake Lefroy [1809]

Last updated: December 30, 2016

The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps). Read more...

Marda Gold Project

Last updated: December 8, 2016

Southern Cross Goldfields Limited proposes to develop an open pit gold mine operation and gold processing plant 150 kilometres north of Southern Cross. The proposal would involve mining 1.6 million tonnes (Mt) of ore and 8.2 Mt of waste rock over a life of 2.5 years at three pit locations; Marda Central, King Brown and Golden Orb. The processing plant, tailings storage facility, and two out of four of the waste rock landforms would be located at Marda Central. The remaining two waste rock... Read more...

KCGM Hidden Secret Project

Last updated: December 7, 2016

The proposal referred to the Environmental Protection Authority is the Hidden Secret underground Mine. Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) proposes to mine for gold at the Hidden Secret ore body. Hidden secret is an underground ore body located east of Williamstown, 350 metres east of the Mt Charlotte underground mine. The Mt Charlotte Underground Mine is operated by KCGM and is located adjacent to the City of Kalgoorlie-Boulder, approximately 600 kilometres east of Perth. Mining... Read more...

Gidji Gold Processing Plant, near Kalgoorlie (s46)

Last updated: June 30, 2016

The proposal is for the operation of a gold concentrate processing plant and associated infrastructure at Gidji approximately 17 km north of the City of Kalgoorlie-Boulder. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 28 and Ministerial Statement 77 . Read more...

Fimiston Gold Mine Operations Extension Stage 3 and Mine Closure Planning

Last updated: June 17, 2015

This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the proposal by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) to expand their Fimiston operations in Kalgoorlie by widening and deepening the Superpit by means of the Golden Pike Cutback, and to plan for mine closure. Read more...

Gold Mine Developments on Lake Lefroy (s46)

Last updated: December 6, 2013

Proposed Gold Mining at Lake Lefroy. Inquiry under s46 to amend Ministerial Statement 548 . Read more...

Red October Gold Project, 80km south of Laverton

Last updated: December 15, 2009

The Red October Gold Project is located on the western shore of Lake Carey, 80km south of Laverton. The proposal is to mine approximately 16 million tonnes of ore and associated waste material over a two year period involves development of an open cut gold mine and waste rock dumps on the lake bed and construction of mine infrastructure and borrow pits on Anglefish Island adjacent to the mining pit. Read more...

Kalgoorlie Consolidated Gold Mines Noise Regulation 17 Variation (1274)

Last updated: January 8, 2008

This assessment relates to the application by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) for an Approval pursuant to noise regulation 17 for its proposed Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning. The Approval will enable KCGM to vary its noise levels from the prescribed standard in the noise regulations. Following the release of the EPA’s initial advice and recommendations to the Minister for the Environment, Bulletin 1271, the Minister for the... Read more...

Kalgoorlie Consolidated Gold Mines Noise Regulation 17 Variation (1271)

Last updated: November 12, 2007

KCGM has applied to the Minister for the Environment for an Approval pursuant to noise regulation 17 to enable it to vary its noise levels from the prescribed standard in the noise regulations, which has been triggered by the Environmental Impact Assessment of the proposed Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning. In accordance with noise regulation 17, the Minister has referred the application for variation to the EPA for assessment. The basis of the... Read more...

Fimiston project stage II - mine and waste dumps

Last updated: May 17, 2006

KCGM are currently operating open pit and underground gold mines on the Golden Mile, which is an historical gold mining area adjacent to the urban area of Kalgoorlie/Boulder. The proposal involves an expansion of existing open-cut mining activities. KCGM intends to rationalize the various open-cut mining operations on the Fimiston mining leases into a single operation. This would entail incorporation of the existing open pits into two large open pits to be known as the Combined Pit and the... Read more...

Phillips River Gold Project

Last updated: March 28, 2006

The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...

Wallaby Gold Mine Project

Last updated: August 9, 2000

Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...

Gold Mine Developments on Lake Lefroy [1250]

Last updated: July 13, 2000

The proposal includes gold mining developments within a defined project area on Lake Lefroy a naturally occurring salt lake approximately 7 kilometres south-east of Kambalda. Thirteen sites have already been identified for development of open-cut gold mining pits, some with underground portals and mining. Additional sites may be identified within the defined project area. Waste rock dumps, access infrastructure and mining support facilities such as workshops and contractor's compounds will... Read more...

Mining of gold ore from Reward and Northern orebodies adjacent to Mt Charlotte, Kalgoorlie

Last updated: May 31, 1999

Kalgoorlie Consolidated Gold Mines (KCGM), operator of Mt Charlotte underground gold mine in Kalgoorlie, proposes to mine two pits adjacent to Mt Charlotte. These pits will uncover the floor pillars of the Reward and Northern orebodies closest to the surface. the underground portions of these orebodies have already been mined as far as possible from underground. Read more...

Gold roaster to treat refractory ore, Kanowna Belle mine, Stage 2, 18km north-east of Kalgoorlie

Last updated: December 7, 1993

The proposal is for Stage 2 of the Kanowna Belle Gold Mine, comprising the construction and operation of a sulphide concentrate oxidation plant (roaster) within the existing mine site infrastructure. Stage 2 will provide the necessary facilities to further treat high sulphide containing ores to remove the gold that is not extracted in the Stage 1 plant. Stage 2 will include the addition of a vacuum filter, storage tanks, a roaster, gas train and stack, and additional cyanidation tanks. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.