This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions. Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
The proposal is the construction and operation of an open cut gold mine and associated infrastructure, located approximately 330 km east-north-east of Kalgoorlie and 200 km east of Laverton. Read more...Last updated: November 25, 2024
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: November 25, 2024
Hamersley Iron Pty Limited (the proponent) propose to develop the Greater Paraburdoo Iron Ore Hub. The proposal is an expansion of the existing operations at Paraburdoo and Eastern Range which is not subject to a Ministerial Statement issued under Part IV of the, Environmental Protection Act 1986, (EP Act). The proposal area is located approximately six kilometres south of the town of Paraburdoo in the Pilbara region of Western Australia. Existing operations at Paraburdoo and Eastern Range are... Read more...Last updated: November 25, 2024
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: November 25, 2024
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: November 25, 2024
The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...Last updated: November 25, 2024
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016. Read more...Last updated: November 25, 2024
The Proposal is for the above and below water table mining of iron ore from five open cut pits, located approximately 30 km north of Nullagine. The Proposal includes the development of mine pits and associated infrastructure including but not limited to crushing and screening facilities, waste landforms, run of mine pad, access roads, solar field, administration, accommodation camp, stockpile and laydown areas, borrow pits, groundwater bores and transfer infrastructure, explosives magazine,... Read more...Last updated: November 24, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 21, 2024
Proposal by the Water Corporation to renew a groundwater licence to continue abstraction from the Millstream aquifer of 6 gigalitres per annum (GL/a). The Water Corporation hold an existing temporary groundwater licence to abstract 3GL/a from the Millstream aquifer until February 2027 (GWL205069), enabling combined abstraction of up to 9GL/a. The referrer of the proposal contends that this significantly exceeds the Department of Water and Environmental Regulation’s sustainable limit of 6 GL/a,... Read more...Last updated: November 4, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: November 1, 2024
Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...