This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 18, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: January 17, 2023
Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia. The proposal includes a conceptual footprint of approximately 4,700 hectares (ha) to support the development, operation and closure of two new AWT iron ore deposits within a proposed Development Envelope of approximately 14,085 ha. The key... Read more...Last updated: January 9, 2023
The proposal is for the installation and operation of a Heated Overland Thermal Treatment (‘Hottpad’) system at t he Karratha liquid waste treatment plant and waste transfer station located approximately 6 kilometres south-west of Karratha. The Hottpad is intended to treat hydrocarbon-impacted ‘sludge’ from oil and gas operations in the region, that are currently transported interstate for thermal treatment. The proposal has a project life of 10 years and involves a self-sustaining smouldering... Read more...Last updated: January 4, 2023
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: December 22, 2022
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: December 21, 2022
The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...Last updated: December 19, 2022
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...Last updated: November 24, 2022
Horizon Power is proposing to construct common user transmission infrastructure to enable the supply of grid electricity to the Burrup Strategic Industrial Area (SIA). The Proposal includes construction of an approximately 7 km long, 132 kV overhead transmission line between the Dampier substation and the Burrup SIA, clearing of unsealed access tracks along the transmission line route, an extension of the existing Dampier substation (inclusive of 132 kV switchgear, fencing and ancillary... Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...Last updated: October 24, 2022
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...Last updated: October 24, 2022
The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...Last updated: October 19, 2022
Adequacy of the existing implementation conditions of the above mentioned Ministerial Statements with respect to avoiding, reducing and offsetting greenhouse gas emissions. Read more...Last updated: October 5, 2022
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...Last updated: September 12, 2022
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...Last updated: September 5, 2022
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. Read more...Last updated: September 5, 2022
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: September 5, 2022
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: September 1, 2022
Hamersley Iron Pty Limited have submitted a revised proposal for Brockman IV. This proposal provides for the expansion of the existing mine including additional clearing and the release of excess water, as well as some other minor changes. Read more...Last updated: August 24, 2022
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...