Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions
      • Ministerial Statements
      • Ministerial decisions (s45(8))

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chairman's Determinations

    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidelines for planners and developers
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Industrial (2) Apply Industrial filter
  • Gold (1) Apply Gold filter
  • Iron Ore (1) Apply Iron Ore filter

Filter by current status:

  • Ministerial Statement published (2) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Minister's appeals determinations published (1) Apply Minister's appeals determinations published filter

Filter by relevant environmental factors:

  • Air Quality (2) Apply Air Quality filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Flora and Vegetation (1) Apply Flora and Vegetation filter
  • Greehouse Gas Emissions (1) Apply Greehouse Gas Emissions filter
  • Human Health (1) Apply Human Health filter
  • Inland Waters (1) Apply Inland Waters filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • (-) Remove Alcoa of Australia Limited filter Alcoa of Australia Limited

Filter by region:

  • Peel (3) Apply Peel filter
  • South West (1) Apply South West filter

Filter by last updated:

  • 2020 (1) Apply 2020 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (1) Apply 2016 filter
  • 1988 (1) Apply 1988 filter
  1. Home
  2. Proposal search
  3. Alcoa of Australia Limited

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Pinjarra Alumina Refinery Revised Proposal

Last updated: July 6, 2020

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Wagerup Alumina Refinery - production to a maximum capacity of 4.7 million tonnes per annum and associated bauxite mining proposal (s46)

Last updated: December 18, 2017

The Wagerup Alumina Refinery revised proposal is to construct and operate the Wagerup Alumina Refinery to a maximum production capacity of 4.7 million tonnes per annum (Mtpa) and its associated bauxite mining. The proponent for the proposal, Alcoa of Australia (Alcoa), requested an extension of the Time Limit of Authorisation for substantial commencement (now referred to as the Time Limit of Proposal Implementation) to be extended by five years to 14 September 2021 as the third production unit... Read more...

Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining (s46)

Last updated: September 27, 2016

The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...

Hedges gold project, Boddington

Last updated: February 25, 1988

The proposal is to establish a gold mining operation of up to 2 million tonnes per annum with a project life of 4-5 years. The mine is proposed to be located in State Forest, with processing and waste disposal facilities located on private land. The mine would be adjacent to the currently operating Boddington Gold Mines, and would mine the same ore body. The proposed mine is located in the eastern, low rainfall. section of the Darling Range and also within the catchment area of the 34 Mile... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2021 Government of Western Australia. All rights reserved.