This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 16, 2020
Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha. Read more...Last updated: February 10, 2020
GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...Last updated: January 20, 2020
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: October 14, 2019
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: September 18, 2019
Inquire into and report on the matter of changing implementation condition 5-1: Air Quality in Ministerial Statement 870 for the above proposal to protect rock art. Read more...Last updated: August 14, 2019
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: July 8, 2019
The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. Read more...Last updated: July 1, 2019
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: June 6, 2019
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: May 23, 2019
Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...Last updated: March 26, 2019
The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...Last updated: February 25, 2019
New Energy Corporation Pty Ltd propose to revise the Waste to Energy technology for their approved Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone (Shire of Rockingham). Read more...Last updated: February 25, 2019
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...Last updated: September 17, 2018
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: August 13, 2018
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...