This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 16, 2023
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: September 6, 2022
Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...Last updated: June 20, 2022
The proponent (VRX Silica Ltd) proposes to develop a high-grade silica sand mine in the Geraldton Sandplain bioregion of WA, approximately 260 km north of Perth and 20km North-West of Eneabba. The proposal would include a total disturbance of 334 hectares of native vegetation. Vegetation and topsoil would be relocated to rehabilitation areas using a Vegetation Direct Transfer method (VDT). Mining is proposed to occur in blocks (150m x 150m), with up to five blocks being mined each year. The... Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: May 6, 2022
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: February 1, 2022
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: January 31, 2022
APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: October 4, 2021
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...Last updated: August 9, 2021
The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...Last updated: June 24, 2021
Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: April 28, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...