Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Iron Ore (51) Apply Iron Ore filter
  • Infrastructure (11) Apply Infrastructure filter
  • Copper (2) Apply Copper filter
  • Oil and gas (2) Apply Oil and gas filter
  • Salt (2) Apply Salt filter
  • Industrial (1) Apply Industrial filter
  • Manganese (1) Apply Manganese filter
  • Molybdenum (1) Apply Molybdenum filter
  • Power generation (1) Apply Power generation filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter

Filter by current status:

  • Ministerial Statement published (46) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (8) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (4) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by relevant environmental factors:

  • (-) Remove Subterranean Fauna filter Subterranean Fauna
  • Flora and Vegetation (59) Apply Flora and Vegetation filter
  • Terrestrial Fauna (48) Apply Terrestrial Fauna filter
  • Hydrological Processes (29) Apply Hydrological Processes filter
  • Social Surroundings (28) Apply Social Surroundings filter
  • Inland Waters Environmental Quality (25) Apply Inland Waters Environmental Quality filter
  • Inland Waters (15) Apply Inland Waters filter
  • Air Quality (11) Apply Air Quality filter
  • Greenhouse Gas Emissions (7) Apply Greenhouse Gas Emissions filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • Landforms (3) Apply Landforms filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Human Health (1) Apply Human Health filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • People (1) Apply People filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (8) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (7) Apply Hamersley Iron Pty Limited filter
  • Robe River Mining Co. Pty. Ltd (3) Apply Robe River Mining Co. Pty. Ltd filter
  • Robe River Mining Company Pty Ltd (3) Apply Robe River Mining Company Pty Ltd filter
  • API Management Pty Limited (2) Apply API Management Pty Limited filter
  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Hamersley HMS Pty Limited (2) Apply Hamersley HMS Pty Limited filter
  • Hope Downs Management Services Pty Ltd (2) Apply Hope Downs Management Services Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (2) Apply Roy Hill Iron Ore Pty Ltd filter
  • Agrimin Limited (1) Apply Agrimin Limited filter
  • Atlas Iron (1) Apply Atlas Iron filter
  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • Atlas Iron Ltd (1) Apply Atlas Iron Ltd filter
  • Australian Aboriginal Mining Corporation Pty Ltd (1) Apply Australian Aboriginal Mining Corporation Pty Ltd filter
  • BC Pilbara Iron Ore Pty Ltd (1) Apply BC Pilbara Iron Ore Pty Ltd filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • Consolidated Minerals Pty Ltd (1) Apply Consolidated Minerals Pty Ltd filter
  • FerrAus Pty Limited (1) Apply FerrAus Pty Limited filter
  • Flinders Mines Limited (1) Apply Flinders Mines Limited filter
  • FMG (1) Apply FMG filter
  • FMG Iron Bridge (Aust) Pty Ltd (1) Apply FMG Iron Bridge (Aust) Pty Ltd filter
  • Hamersley Iron – Yandi Pty Limited (1) Apply Hamersley Iron – Yandi Pty Limited filter
  • Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) (1) Apply Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hancock Prospecting Pty Ltd (1) Apply Hancock Prospecting Pty Ltd filter
  • Hastings Technology Metals Ltd (1) Apply Hastings Technology Metals Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Kalium Lakes Potash Pty Ltd (1) Apply Kalium Lakes Potash Pty Ltd filter
  • Mineralogy Pty Ltd (1) Apply Mineralogy Pty Ltd filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • Mount Bruce Mining Pty Ltd (1) Apply Mount Bruce Mining Pty Ltd filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Readymix Holdings Pty Limited (1) Apply Readymix Holdings Pty Limited filter
  • Reward Minerals (1) Apply Reward Minerals filter
  • Rio Tinto Pty Ltd (1) Apply Rio Tinto Pty Ltd filter
  • Robe River Mining Co. Pty Ltd. (1) Apply Robe River Mining Co. Pty Ltd. filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Venturex Resources Limited (1) Apply Venturex Resources Limited filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2023 (3) Apply 2023 filter
  • 2022 (10) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (9) Apply 2020 filter
  • 2019 (5) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (6) Apply 2016 filter
  • 2015 (5) Apply 2015 filter
  • 2014 (4) Apply 2014 filter
  • 2013 (9) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (2) Apply 2009 filter
  • 2006 (3) Apply 2006 filter
  1. Home
  2. Proposal search
  3. Subterranean Fauna
  4. Pilbara

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Nammuldi-Silvergrass Expansion Project

Last updated: July 10, 2015

The proposal involves the expansion of existing operations of the Nammuldi-Silvergrass Iron Ore Project and is therefore a Revised Proposal.The proposal includes the additional clearing of approximately 3,900 ha of vegetation for mine pits, waste dumps and associated mine infrastructure and facilities, and approximately 2,500 ha for the IAA. Read more...

Extension Mining Proposal

Last updated: May 14, 2015

The proposal is to construct and operate an open cut iron ore mine and associated infrastructure for the extraction, processing and transport of iron ore. The proposal is located approximately 70 km north-west of Newman in the Pilbara region of Western Australia. Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Solomon Iron Ore Project

Last updated: October 15, 2014

Fortescue Metals Group Limited (Fortescue) proposes to develop two new mines within the Solomon Project, a greenfield site approximately 60 kilometres (km) north of Tom Price and adjacent to the North Eastern boundary of the Karijini National Park, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway. Read more...

West Angelas Iron Ore Project (s46) [1914]

Last updated: June 12, 2014

The development of iron ore mines at Deposits ‘A’, ‘B’, and ‘E’, waste dumps, ore processing operation and associated infrastructure at West Angelas, 130 kilometres west of Newman, and rail infrastructure. Inquiry under s46 to amend the conditions of Ministerial Statement 514 . Read more...

Marandoo Mine Phase 2

Last updated: June 4, 2014

The expansion of existing mining operations at Marandoo by mining below the water table, including expansion of the existing mine pit and development of new waste dumps. Read more...

Gorgon Gas Development - Additional Construction Laydown and Operations Support Area

Last updated: April 2, 2014

Chevron Australia Pty Ltd proposes to clear an additional 32 hectares of land within a 36 hectare development envelope on Barrow Island. The clearing is for the purposes of an additional construction laydown and operations support area, required to support the construction and operation of the Gorgon Gas Development referred to in Ministerial Statement 800 dated 10 August 2009 and Ministerial Statement 865 dated 8 June 2011. Read more...

FerrAus Pilbara Project

Last updated: December 31, 2013

The proposal is to expand the FerrAus Pilbara Project to include below the water table mining at the Robertson Range Area and to develop additional mine pits at the Davidson Creek Area, located in the East Pilbara region of Western Australia. Read more...

Western Turner Syncline - Section 10 Iron Ore Mine

Last updated: December 10, 2013

The proposal involves the development of a satellite iron ore mine at Section 10, 20km northwest of the Tom Price minesite, to supplement falling production from the Tom Price mine as it nears the end of its life. The orebody occupies the lower slopes of the main range of hills in the Western Turner Syncline. The eastern and western portions of the proposed pit, where the ore is shallowest, would be mined first and subsequently backfilled, but the central portion would remain open. Read more...

Hope Downs Iron Ore Mine

Last updated: November 7, 2013

To establish an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Goldsworthy Iron Ore Mines Extension Project

Last updated: October 9, 2013

The proposal involves extensions to mines at Yarrie and Sunrise Hill, new mines at Nimingarra (Nim I), Cattle Gorge and associated infrastructure such as haul roads and a power line. The proposal also seeks to revise the decommissioning and rehabilitation plan for the entire Goldsworthy operations. Read more...

Turee Syncline Iron Ore Project

Last updated: August 22, 2013

The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Turee Syncline deposit, located approximately 30 kilometres north-east of Paraburdoo. Read more...

Western Turner Syncline Stage 2 – B1 and Section 17 Deposits

Last updated: August 22, 2013

The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Western Turner Syncline Stage 2 – B1 and Section 17 deposits, located approximately 30 kilometres west of Tom Price in the central Pilbara Region, Western Australia. Read more...

Mesa A / Warramboo Iron Ore Project

Last updated: March 27, 2013

The proposal is to mine iron ore at Mesa A / Warramboo in the Robe Valley, Pilbara. The proposal involves the development of mine pits at Mesa A and Warramboo; a primary sizer processing plant; associated mine infrastructure; and the construction of a rail line to link into existing Mesa J mining operations., Note:, Also see Mesa A / Warramboo Iron Ore Project (s43) Read more...

Mesa A / Warramboo Iron Ore Project (s43)

Last updated: March 27, 2013

Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...

Mesa K Remnant Iron Ore Mining Project

Last updated: February 25, 2013

To undertake mining of up to 12 – 13 Mt of remnant iron ore in the previously mined Mesa K deposit to meet the shortfall of dry ore produced from Mesa J. The proposal will utilise the existing Mesa J equipment fleet, personnel and infrastructure. Read more...

Pardoo Direct Shipping Ore Project Port Hedland

Last updated: July 24, 2012

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...

Hope Downs Iron Ore Mine (s. 46)

Last updated: April 12, 2012

The assessment is an inquiry into conditions of Ministerial Statement 584 , and relates to discharge of water to Weeli Wolli Springs. The original proposal is for the establishment of an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Orebody 24/25 Upgrade Project

Last updated: July 8, 2010

BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...

Balmoral South Iron Ore Project, Cape Preston, WA

Last updated: December 23, 2009

Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.