This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: November 23, 2021
Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...Last updated: October 25, 2021
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: October 18, 2021
Lot 902 Flynn Drive Neerabup is 22.03 hectares (ha) hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lots of 8.01 ha and a balance 14.02 ha lot for future industrial development with clearing and earthworks. The proposal is within Bush Forever Site 295, and fully vegetated. Read more...Last updated: August 31, 2021
Digital 4 Pty Ltd proposes to develop Lot 802 Erindale Road Hamersley for urban development. Clearing of native vegetation will also occur within the western portion of Lot 803 to establish an Asset Protection Zone to meet requirements for bushfire management. The urban development will include residential development, internal public road network, public open space, a conservation area, drainage swales/basins and sewer easements. The development envelope for the proposal is 13.55 hectares. The... Read more...Last updated: July 29, 2021
The proponent is proposing to develop the remainder of Part Lot 420, Yangebup Road, Yangebup for educational purposes; the site contains an existing school and church. The development envelope for the proposal is 2.63 hectares (ha) and contains 2.07 ha of native vegetation. This vegetation is proposed to be cleared for the proposal which includes buildings, an access road, carpark and recreation areas. Read more...Last updated: July 28, 2021
Hanson Australia Pty Ltd (formerly Rocla Pty Ltd) proposes to extract sand within Bush Forever Site 390, on mining tenements M70/1142 and M70/1088 approximately 20km South of Perth at Lot 467 Jandakot Road, Banjup (City of Cockburn). The proposal would include: - a development envelope of 9.56 hectares (ha), including 5.63 ha that has been historically cleared; - clearing of 3.93 ha of native vegetation; - sand extraction of 300,000 tonnes over a period of approximately three years; - dry... Read more...Last updated: July 15, 2021
Co-operative Bulk Handling Ltd (CBH) propose to develop a facility for the import and storage of dry (granular) and liquid urea ammonium nitrate (UAN) fertiliser products. The proposal consists of onshore and offshore components and is located adjacent and within the existing Rockingham Industrial Zone (RIZ). The offshore component will extend into the southern Cockburn Sound. The proposal involves the construction of a dedicated liquid (UAN) pipeline that will follow the alignment of the... Read more...Last updated: July 15, 2021
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...Last updated: June 28, 2021
The Water Corporation are proposing to construct a new 12.5 km pressured wastewater pipeline, primarily along Gnangara Road, from the Barrambie Way Sewerage Pumping Station in Ellenbrook to the Gnangara Branch Sewer in Wangara. The total disturbance area for the proposal is 30 ha, with a total clearing of no more than 0.3 ha of native vegetation. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: February 1, 2021
Peet Stratton Pty Ltd propose to develop the Lot 102 for urban uses as part of the wider Movida residential development. The proposal area is 8.6 hectares (ha) of which approximately 6ha is proposed for development. 2.65ha of native vegetation is proposed to be retained for conservation purposes. Read more...Last updated: January 22, 2021
Changes to condition 11 Offsets following a change to proposal after assessment Read more...Last updated: January 22, 2021
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; New... Read more...Last updated: August 10, 2020
The proposal is to construct and operate a multi-use motorsport complex on Lot 78 Punrak Road Keysbrook, and to redirect stormwater to Lot 400 Wigg Road Keysbrook. The proposal would be used for road safety driver training, amateur car events, a go-kart track, V8 supercar events, motorbikes and world rally championships. The proposal would operate seven days a week from 8.00 am to 6.00 pm, with potential for extended hours over weekends for special events. Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...